IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,091

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0444 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,581 $0 Implemented
TN0444 # 03 Y:1991 03 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $324 $360 Implemented
TN0444 # 04 Y:1991 04 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $133 $60 Implemented
TN0446 # 01 Y:1991 01 1991 INSTALL TIMERS AND/OR THERMOSTATS $5,675 $2,700 Implemented
TN0446 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $1,089 $1,590 Implemented
TN0446 # 03 Y:1991 03 1991 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $507 $0 Implemented
TN0446 # 04 Y:1991 04 1991 INSTALL / REPAIR INSULATION ON STEAM LINES $488 $165 Implemented
TN0446 # 05 Y:1991 05 1991 KEEP LAMPS AND REFLECTORS CLEAN $1,068 $0 Implemented
TN0446 # 06 Y:1991 06 1991 INSULATE BARE EQUIPMENT $338 $859 Implemented
UD0353 # 01 Y:1991 01 1991 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,492 $0 Not Implemented
UD0353 # 02 Y:1991 02 1991 RECOVER AND REUSE COOLING WATER $54,322 $0 Not Implemented
UD0353 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $29,392 $0 Not Implemented
UD0353 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,700 $0 Not Implemented
UD0353 # 05 Y:1991 05 1991 INSTALL TIMERS AND/OR THERMOSTATS $5,466 $1,600 Not Implemented
UD0353 # 06 Y:1991 06 1991 INSTALL STORM WINDOWS AND DOORS $877 $1,080 Not Implemented
UD0353 # 07 Y:1991 07 1991 REDUCE VENTILATION AIR $2,075 $1,000 Not Implemented
UD0354 # 01 Y:1991 01 1991 OPTIMIZE PLANT POWER FACTOR $12,118 $4,375 Implemented
UD0354 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,516 $0 Implemented
UD0354 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $21,096 $0 Implemented
UD0354 # 04 Y:1991 04 1991 INSTALL SET-BACK TIMERS $3,907 $0 Implemented
UD0354 # 05 Y:1991 05 1991 INSTALL SET-BACK TIMERS $1,636 $0 Implemented
UD0355 # 01 Y:1991 01 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $19,825 $0 Implemented
UD0355 # 02 Y:1991 02 1991 RECOVER WASTE HEAT FROM EQUIPMENT $3,503 $10,000 Implemented
UD0355 # 03 Y:1991 03 1991 INSTALL TIMERS AND/OR THERMOSTATS $7,437 $2,800 Implemented
UD0355 # 04 Y:1991 04 1991 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,886 $30,000 Implemented