Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,152
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0036 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,000 | $20,000 | Not Implemented |
UD0036 # 03 Y:1982 | 03 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $1,018 | $112 | Not Implemented |
UD0036 # 04 Y:1982 | 04 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,120 | $5,535 | Implemented |
UD0036 # 05 Y:1982 | 05 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,834 | $6,650 | Not Implemented |
UD0036 # 06 Y:1982 | 06 | 1982 | REDUCE VENTILATION AIR | $3,333 | $5 | Not Implemented |
UD0036 # 07 Y:1982 | 07 | 1982 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,551 | $5,000 | Not Implemented |
TN0121 # 01 Y:1982 | 01 | 1982 | INSTALL SET-BACK TIMERS | $1,720 | $0 | Not Implemented |
TN0121 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $953 | $0 | Not Implemented |
TN0121 # 03 Y:1982 | 03 | 1982 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $485 | $700 | Not Implemented |
TN0123 # 01 Y:1982 | 01 | 1982 | REPAIR AND ELIMINATE STEAM LEAKS | $30,377 | $1,280 | Not Implemented |
TN0123 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,019 | $2,840 | Not Implemented |
TN0123 # 03 Y:1982 | 03 | 1982 | REPAIR OR REPLACE STEAM TRAPS | $10,191 | $480 | Not Implemented |
TN0123 # 04 Y:1982 | 04 | 1982 | INSULATE BARE EQUIPMENT | $26,503 | $3,460 | Not Implemented |
TN0123 # 05 Y:1982 | 05 | 1982 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,334 | $230 | Not Implemented |
TN0123 # 06 Y:1982 | 06 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,808 | $200 | Not Implemented |
TN0123 # 07 Y:1982 | 07 | 1982 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $72,394 | $7,328 | Not Implemented |
TN0125 # 01 Y:1982 | 01 | 1982 | INSTALL SET-BACK TIMERS | $6,284 | $0 | Not Implemented |
TN0125 # 02 Y:1982 | 02 | 1982 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $4,900 | $0 | Not Implemented |
TN0125 # 03 Y:1982 | 03 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,430 | $0 | Not Implemented |
TN0125 # 04 Y:1982 | 04 | 1982 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,260 | $17,250 | Not Implemented |
TN0126 # 01 Y:1982 | 01 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,500 | $500 | Not Implemented |
TN0126 # 02 Y:1982 | 02 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $254 | $0 | Not Implemented |
TN0127 # 01 Y:1982 | 01 | 1982 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $138 | $300 | Not Implemented |
TN0127 # 02 Y:1982 | 02 | 1982 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $330 | $75 | Not Implemented |
TN0127 # 03 Y:1982 | 03 | 1982 | REDUCE VENTILATION AIR | $1,095 | $25 | Not Implemented |