IAC logo
IAC Assessment: TN0123
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: TN0123
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Tennessee
Assessment Year 1982
Principal Product PAPERBOARD
NAICS n/a
SIC 2631 - Paperboard Mills
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 75,000 Tons
Production Hrs. Annual 8,736
Location (State) TN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,723,713 46,339,098 kWh $0.04
Natural Gas $2,250,652 713,528 MMBtu $3.15
Fuel Oil #2 $230,074 78,680 MMBtu $2.92
TOTAL ENERGY COSTS $4,204,439
RECOMMENDED SAVINGS* $167,626 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$30,377
Cost:
$1,280
- - $27,540 8,743 $2,837 971 -
-
kWh
$27,540
8,743
MMBtu
$2,837
971
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,019
Cost:
$2,840
$1,019 33,998 - - - - $1,019
33,998
kWh
-
-
MMBtu
-
-
MMBtu
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$10,191
Cost:
$480
- - $9,239 2,933 $952 326 -
-
kWh
$9,239
2,933
MMBtu
$952
326
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$26,503
Cost:
$3,460
- - $24,028 7,628 $2,475 848 -
-
kWh
$24,028
7,628
MMBtu
$2,475
848
MMBtu
05: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$2,334
Cost:
$230
- - $2,116 672 $218 75 -
-
kWh
$2,116
672
MMBtu
$218
75
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$24,808
Cost:
$200
- - $22,507 7,135 $2,301 787 -
-
kWh
$22,507
7,135
MMBtu
$2,301
787
MMBtu
07: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$72,394
Cost:
$7,328
- - $65,634 20,836 $6,760 2,315 -
-
kWh
$65,634
20,836
MMBtu
$6,760
2,315
MMBtu
TOTAL RECOMMENDED Savings:
$167,626
Cost:
$15,818
$1,019 33,998 $151,064 47,947 $15,543 5,322 $1,019
33,998
kWh
$151,064
47,947
MMBtu
$15,543
5,322
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2