Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0426 # 01 Y:1994 | 01 | 1994 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $24,064 | $500 | Implemented |
UD0426 # 02 Y:1994 | 02 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,565 | $38,000 | Implemented |
UD0426 # 03 Y:1994 | 03 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,342 | $0 | Not Implemented |
UD0426 # 04 Y:1994 | 04 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,032 | $400 | Implemented |
UD0426 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,752 | $2,000 | Implemented |
UD0395 # 01 Y:1993 | 01 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,009 | $2,080 | Implemented |
UD0395 # 02 Y:1993 | 02 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,656 | $10,000 | Not Implemented |
UD0395 # 03 Y:1993 | 03 | 1993 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,731 | $0 | Implemented |
UD0395 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,051 | $8,096 | Implemented |
UD0395 # 05 Y:1993 | 05 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,997 | $48,174 | Not Implemented |
UD0395 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,516 | $1,200 | Implemented |
UD0395 # 07 Y:1993 | 07 | 1993 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $11,563 | $10,625 | Implemented |
UD0424 # 01 Y:1994 | 01 | 1994 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,026 | $0 | Implemented |
UD0424 # 02 Y:1994 | 02 | 1994 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $539 | $0 | Not Implemented |
UD0424 # 03 Y:1994 | 03 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,051 | $2,500 | Implemented |
UD0423 # 01 Y:1994 | 01 | 1994 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $18,774 | $50,000 | Implemented |
UD0423 # 02 Y:1994 | 02 | 1994 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $62,721 | $150,000 | Not Implemented |
UD0423 # 03 Y:1994 | 03 | 1994 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,236 | $30,000 | Implemented |
UD0423 # 04 Y:1994 | 04 | 1994 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,024 | $400 | Implemented |
UD0423 # 05 Y:1994 | 05 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,559 | $10,000 | Not Implemented |
UD0423 # 06 Y:1994 | 06 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $920 | $0 | Implemented |
UD0422 # 01 Y:1994 | 01 | 1994 | OPTIMIZE PLANT POWER FACTOR | $2,520 | $8,000 | Implemented |
UD0422 # 02 Y:1994 | 02 | 1994 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $20,950 | $5,000 | Implemented |
UD0422 # 03 Y:1994 | 03 | 1994 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $1,812 | $6,000 | Implemented |
UD0422 # 04 Y:1994 | 04 | 1994 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $691 | $3,827 | Implemented |