IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0422 # 05 Y:1994 05 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,513 $47,000 Implemented
UD0421 # 01 Y:1994 01 1994 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $61,963 $15,000 Implemented
UD0421 # 02 Y:1994 02 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,164 $30,000 Not Implemented
UD0421 # 03 Y:1994 03 1994 MINIMIZE WATER USAGE $65,878 $40,000 Not Implemented
UD0421 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,191 $37,559 Implemented
UD0421 # 05 Y:1994 05 1994 USE DEMAND CONTROLLER OR LOAD SHEDDER $32,472 $30,000 Not Implemented
UD0421 # 06 Y:1994 06 1994 REPAIR OR REPLACE STEAM TRAPS $8,304 $10,000 Not Implemented
WV0017 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,540 $2,498 Implemented
WV0017 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $567 $2,760 Not Implemented
WV0017 # 03 Y:1994 03 1994 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $5,550 $250 Not Implemented
WV0017 # 04 Y:1994 04 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,053 $775 Implemented
WV0017 # 05 Y:1994 05 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $454 $140 Not Implemented
WV0017 # 06 Y:1994 06 1994 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $274 $25 Not Implemented
WV0017 # 07 Y:1994 07 1994 USE SYNTHETIC LUBRICANT $652 $0 Implemented
WV0017 # 08 Y:1994 08 1994 DIRECT WARMEST AIR TO COMBUSTION INTAKE $497 $960 Not Implemented
WV0017 # 09 Y:1994 09 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,620 $200 Implemented
UD0420 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $25,572 $16,000 Implemented
UD0420 # 02 Y:1993 02 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $64,530 $13,000 Not Implemented
UD0420 # 03 Y:1993 03 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $14,071 $250 Not Implemented
UD0420 # 04 Y:1993 04 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,840 $0 Not Implemented
UD0420 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,048 $2,456 Implemented
UD0420 # 06 Y:1993 06 1993 RECOVER WASTE HEAT FROM EQUIPMENT $3,897 $3,000 Implemented
UD0420 # 07 Y:1993 07 1993 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $26,098 $0 Not Implemented
UD0419 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $19,715 $13,400 Implemented
UD0419 # 02 Y:1993 02 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $602 $0 Not Implemented