IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,682

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0104 # 02 Y:1990 02 1990 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $5,431 $0 Not Implemented
WI0104 # 03 Y:1990 03 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,037 $14,700 Implemented
WI0104 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $373 $473 Implemented
WI0104 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,799 $1,000 Implemented
WI0104 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $575 $0 Implemented
WI0104 # 07 Y:1990 07 1990 INSTALL TIMERS AND/OR THERMOSTATS $792 $250 Not Implemented
WI0104 # 08 Y:1990 08 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $100 $0 Implemented
WI0104 # 09 Y:1990 09 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,766 $1,600 Not Implemented
WI0099 # 05 Y:1990 05 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,501 $1,500 Not Implemented
WI0099 # 06 Y:1990 06 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,366 $4,800 Not Implemented
WI0099 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,255 $1,000 Implemented
WI0099 # 08 Y:1990 08 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,027 $0 Implemented
WI0099 # 09 Y:1990 09 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $370 $0 Not Implemented
WI0099 # 10 Y:1990 10 1990 INSTALL TIMERS AND/OR THERMOSTATS $1,991 $520 Implemented
WI0100 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,333 $500 Implemented
WI0100 # 02 Y:1990 02 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,810 $5,000 Not Implemented
WI0100 # 03 Y:1990 03 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $7,708 $7,800 Not Implemented
WI0100 # 04 Y:1990 04 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $548 $275 Not Implemented
WI0100 # 05 Y:1990 05 1990 INSTALL STORM WINDOWS AND DOORS $10,313 $35,628 Not Implemented
WI0100 # 06 Y:1990 06 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,350 $2,100 Not Implemented
WI0100 # 07 Y:1990 07 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,180 $1,500 Implemented
WI0100 # 08 Y:1990 08 1990 RECOVER WASTE HEAT FROM EQUIPMENT $2,219 $3,000 Not Implemented
WI0100 # 09 Y:1990 09 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $828 $262 Implemented
WI0100 # 10 Y:1990 10 1990 INSTALL SET-BACK TIMERS $573 $200 Not Implemented
WI0100 # 11 Y:1990 11 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,495 $0 Not Implemented