Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,063
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0012 # 03 Y:2008 | 03 | 2008 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $5,988 | $146 | Not Implemented |
DL0012 # 04 Y:2008 | 04 | 2008 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $6,766 | $16,500 | Not Implemented |
DL0012 # 05 Y:2008 | 05 | 2008 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,154 | $0 | Not Implemented |
DL0012 # 06 Y:2008 | 06 | 2008 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,902 | $11,000 | Not Implemented |
DL0010 # 01 Y:2007 | 01 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,964 | $2,872 | Implemented |
DL0010 # 02 Y:2007 | 02 | 2007 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $9,440 | $2,500 | Not Implemented |
DL0010 # 03 Y:2007 | 03 | 2007 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $4,305 | $225 | Implemented |
DL0010 # 04 Y:2007 | 04 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,529 | $450 | Implemented |
DL0010 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,409 | $0 | Implemented |
DL0010 # 06 Y:2007 | 06 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $622 | $622 | Not Implemented |
DL0010 # 07 Y:2007 | 07 | 2007 | INSTALL OCCUPANCY SENSORS | $454 | $524 | Not Implemented |
DL0009 # 01 Y:2007 | 01 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $28,059 | $10,000 | Implemented |
DL0009 # 02 Y:2007 | 02 | 2007 | REDESIGN PROCESS | $15,567 | $6,300 | Not Implemented |
DL0009 # 03 Y:2007 | 03 | 2007 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $11,200 | $60,000 | Not Implemented |
DL0009 # 04 Y:2007 | 04 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $10,793 | $11,313 | Not Implemented |
DL0009 # 05 Y:2007 | 05 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,192 | $50,000 | Implemented |
DL0009 # 06 Y:2007 | 06 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,454 | $0 | Not Implemented |
DL0009 # 07 Y:2007 | 07 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,890 | $695 | Implemented |
DL0009 # 08 Y:2007 | 08 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,941 | $590 | Not Implemented |
DL0009 # 09 Y:2007 | 09 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,924 | $3,809 | Implemented |
DL0009 # 10 Y:2007 | 10 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $4,500 | $4,968 | Not Implemented |
DL0009 # 11 Y:2007 | 11 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,550 | $20,000 | Implemented |
DL0009 # 12 Y:2007 | 12 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $160 | Not Implemented |
DL0009 # 13 Y:2007 | 13 | 2007 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $302 | $10,000 | Implemented |
DL0009 # 14 Y:2007 | 14 | 2007 | USE SOLAR HEAT TO MAKE ELECTRICTY | $20,475 | $1,275,000 | Not Implemented |