IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

894

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0139 # 03 Y:1988 03 1988 OPTIMIZE PLANT POWER FACTOR $19,447 $9,000 Implemented
MA0139 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,222 $3,943 Not Implemented
MA0139 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,467 $72,797 Not Implemented
MA0135 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,462 $359 Implemented
MA0135 # 02 Y:1988 02 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,147 $2,606 Implemented
MA0135 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $380 $70 Not Implemented
MA0135 # 04 Y:1988 04 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $598 $40 Implemented
MA0135 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,736 $1,140 Implemented
MA0135 # 06 Y:1988 06 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,813 $3,320 Not Implemented
MA0135 # 07 Y:1988 07 1988 TURN OFF EQUIPMENT WHEN NOT IN USE $2,525 $0 Implemented
MA0135 # 08 Y:1988 08 1988 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $2,029 $0 Implemented
MA0125 # 01 Y:1988 01 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,470 $0 Not Implemented
MA0125 # 02 Y:1988 02 1988 INSULATE BARE EQUIPMENT $2,156 $1,143 Not Implemented
MA0125 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $985 $201 Implemented
MA0125 # 04 Y:1988 04 1988 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,614 $18,000 Not Implemented
MA0122 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,227 $261 Not Implemented
MA0122 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,093 $6,500 Not Implemented
MA0122 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,193 $300 Not Implemented
MA0122 # 04 Y:1988 04 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,916 $10,000 Implemented
MA0122 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,883 $3,400 Implemented
MA0121 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,877 $0 Implemented
MA0121 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,535 $400 Implemented
MA0121 # 03 Y:1988 03 1988 DIRECT WARMEST AIR TO COMBUSTION INTAKE $992 $251 Not Implemented
MA0121 # 04 Y:1988 04 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,017 $200 Implemented
MA0121 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,134 $187 Implemented