IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0031 # 07 Y:1995 07 1995 INSULATE BARE EQUIPMENT $3,364 $1,444 Not Implemented
NV0031 # 08 Y:1995 08 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,776 $0 Implemented
NV0031 # 09 Y:1995 09 1995 OPTIMIZE PLANT POWER FACTOR $982 $3,382 Implemented
NV0030 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,268 $3,296 Not Implemented
NV0030 # 02 Y:1995 02 1995 INSTALL SPECTRAL REFLECTORS / DELAMP $2,584 $100 Not Implemented
NV0030 # 03 Y:1995 03 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,433 $6,500 Not Implemented
NV0030 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $833 $0 Not Implemented
NV0030 # 05 Y:1995 05 1995 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $963 $0 Implemented
NV0030 # 06 Y:1995 06 1995 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $564 $114 Not Implemented
NV0030 # 07 Y:1995 07 1995 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $6,740 $11,490 Not Implemented
NV0028 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,290 $543 Implemented
NV0028 # 02 Y:1995 02 1995 OPTIMIZE PLANT POWER FACTOR $665 $2,154 Not Implemented
NV0028 # 03 Y:1995 03 1995 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $15,874 $13,000 Not Implemented
NV0028 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,519 $240 Not Implemented
NV0028 # 05 Y:1995 05 1995 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $6,854 $4,119 Implemented
NV0028 # 06 Y:1995 06 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $165 $0 Implemented
NV0027 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,606 $0 Implemented
NV0027 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,365 $615 Implemented
NV0027 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $589 $200 Implemented
NV0027 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,566 $250 Not Implemented
NV0027 # 05 Y:1995 05 1995 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $886 $1,415 Implemented
NV0027 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $605 $112 Not Implemented
NV0027 # 07 Y:1995 07 1995 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,845 $1,900 Not Implemented
NV0026 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,631 $3,876 Not Implemented
NV0026 # 02 Y:1995 02 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $368 $186 Not Implemented