Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,756
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW0028 # 06 Y:2009 | 06 | 2009 | METER WASTE WATER | $1,060 | $12,000 | Implemented |
UW0028 # 07 Y:2009 | 07 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $847 | $560 | Not Implemented |
UW0028 # 08 Y:2009 | 08 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $0 | Implemented |
UW0027 # 01 Y:2009 | 01 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,632 | $10,324 | Not Implemented |
UW0027 # 02 Y:2009 | 02 | 2009 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $6,650 | $37,000 | Not Implemented |
UW0027 # 03 Y:2009 | 03 | 2009 | INSULATE BARE EQUIPMENT | $5,716 | $871 | Not Implemented |
UW0027 # 04 Y:2009 | 04 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,168 | $2,280 | Implemented |
UW0027 # 05 Y:2009 | 05 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $144 | $0 | Implemented |
UW0026 # 01 Y:2009 | 01 | 2009 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $324,630 | $300,000 | Not Implemented |
UW0026 # 02 Y:2009 | 02 | 2009 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $93,152 | $13,100 | Not Implemented |
UW0026 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,086 | $19,000 | Implemented |
UW0026 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,037 | $0 | Implemented |
UW0026 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,715 | $200 | Implemented |
UW0026 # 06 Y:2009 | 06 | 2009 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,522 | $19,854 | Implemented |
UW0025 # 01 Y:2009 | 01 | 2009 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $52,500 | $78,750 | Not Implemented |
UW0025 # 02 Y:2009 | 02 | 2009 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,361 | $17,335 | Not Implemented |
UW0025 # 03 Y:2009 | 03 | 2009 | USE OPTIMUM TEMPERATURE | $13,200 | $19,800 | Implemented |
UW0025 # 04 Y:2009 | 04 | 2009 | DEVELOP A REPAIR/REPLACE POLICY | $2,986 | $6,091 | Implemented |
UW0024 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,517 | $48,000 | Implemented |
UW0024 # 02 Y:2009 | 02 | 2009 | USE POWER DURING OFF-PEAK PERIODS | $4,202 | $400 | Not Implemented |
UW0024 # 03 Y:2009 | 03 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,586 | $0 | Implemented |
UW0024 # 04 Y:2009 | 04 | 2009 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $889 | $0 | Implemented |
UW0024 # 05 Y:2009 | 05 | 2009 | MINIMIZE WATER USAGE | $3,573 | $0 | Implemented |
UW0023 # 01 Y:2009 | 01 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $23,974 | $120,000 | Implemented |
UW0023 # 02 Y:2009 | 02 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,851 | $2,500 | Implemented |