Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0140 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $842 | $176 | Not Implemented |
IP0140 # 05 Y:2020 | 05 | 2020 | APPLY FOR INVESTMENT INCENTIVES | $26,189 | $10,000 | Not Implemented |
IP0140 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $122 | $45 | Not Implemented |
IP0140 # 07 Y:2020 | 07 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,775 | $4,980 | Not Implemented |
IP0140 # 08 Y:2020 | 08 | 2020 | INSTALL OCCUPANCY SENSORS | $367 | $360 | Not Implemented |
IP0140 # 09 Y:2020 | 09 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,567 | $23,537 | Not Implemented |
UA0230 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,808 | $1,868 | Implemented |
UA0230 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,204 | $50 | Implemented |
UA0230 # 03 Y:2020 | 03 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $928 | $221 | Not Implemented |
UA0230 # 04 Y:2020 | 04 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $229 | $50 | Implemented |
UA0230 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $546 | $546 | Not Implemented |
UA0230 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $116 | $100 | Not Implemented |
UD1020 # 01 Y:2020 | 01 | 2020 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $11,633 | $8,000 | Not Implemented |
UD1020 # 02 Y:2020 | 02 | 2020 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $52,332 | $47,243 | Not Implemented |
UD1020 # 03 Y:2020 | 03 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $13,712 | $26,275 | Not Implemented |
UD1020 # 04 Y:2020 | 04 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $5,584 | $27,600 | Not Implemented |
UD1020 # 05 Y:2020 | 05 | 2020 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $1,639 | $6,550 | Not Implemented |
UD1020 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,337 | $22,400 | Not Implemented |
UD1020 # 07 Y:2020 | 07 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $901 | $0 | Not Implemented |
UD1020 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $832 | $0 | Not Implemented |
MA0822 # 01 Y:2020 | 01 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,975 | $422,509 | Implemented |
MA0822 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,003 | $6,741 | Implemented |
MA0822 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,485 | $4,500 | Not Implemented |
UK2004 # 01 Y:2020 | 01 | 2020 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $6,031 | $21,360 | Implemented |
UK2004 # 02 Y:2020 | 02 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,779 | $0 | Implemented |