IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK2106 # 01 Y:2021 01 2021 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,854 $1,665 n/a
UK2106 # 02 Y:2021 02 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,964 $0 n/a
UK2106 # 03 Y:2021 03 2021 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $685 $1,660 n/a
UK2106 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,035 $2,510 n/a
UK2106 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $330 $80 n/a
UK2106 # 06 Y:2021 06 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $267 $100 n/a
UK2106 # 07 Y:2021 07 2021 INSTALL OCCUPANCY SENSORS $1,142 $640 n/a
UK2106 # 08 Y:2021 08 2021 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $731,255 $3,500,000 n/a
UK2106 # 09 Y:2021 09 2021 PREHEAT COMBUSTION AIR WITH WASTE HEAT $49,643 $75,000 n/a
UK2106 # 10 Y:2021 10 2021 INSULATE BARE EQUIPMENT $1,250 $881 n/a
UK2106 # 11 Y:2021 11 2021 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $10,154 $600 n/a
AM0828 # 01 Y:2021 01 2021 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $26,110 $1,050 Implemented
AM0828 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,720 $4,470 Implemented
AM0828 # 03 Y:2021 03 2021 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,000 $4,250 Not Implemented
AM0828 # 04 Y:2021 04 2021 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,950 $8,890 Implemented
AM0828 # 05 Y:2021 05 2021 INSTALL OCCUPANCY SENSORS $1,530 $1,360 Implemented
AM0828 # 06 Y:2021 06 2021 USE SYNTHETIC LUBRICANT $1,400 $660 Implemented
UU0189 # 01 Y:2021 01 2021 SIZE TRUCKS TO JOB $14,756 $56,000 Not Implemented
UU0189 # 02 Y:2021 02 2021 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $14,084 $14,000 Implemented
UU0189 # 03 Y:2021 03 2021 INSTALL OCCUPANCY SENSORS $2,075 $2,348 Not Implemented
UU0189 # 04 Y:2021 04 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,665 $1,000 Not Implemented
UU0189 # 05 Y:2021 05 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,609 $100 Implemented
UU0189 # 06 Y:2021 06 2021 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $403 $100 Implemented
SD0613 # 01 Y:2021 01 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,677 $16,500 Implemented
SD0613 # 02 Y:2021 02 2021 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,370 $5,000 Implemented