Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,602
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0133 # 06 Y:1991 | 06 | 1991 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $245 | $635 | Not Implemented |
AM0132 # 01 Y:1991 | 01 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,900 | $78,000 | Not Implemented |
AM0132 # 02 Y:1991 | 02 | 1991 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,700 | $78,000 | Not Implemented |
AM0132 # 03 Y:1991 | 03 | 1991 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $5,300 | $0 | Not Implemented |
AM0132 # 04 Y:1991 | 04 | 1991 | PAY UTILITY BILLS ON TIME | $1,315 | $0 | Not Implemented |
AM0132 # 05 Y:1991 | 05 | 1991 | IMPROVE LUBRICATION PRACTICES | $704 | $0 | Not Implemented |
AM0129 # 01 Y:1991 | 01 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $243 | $336 | Not Implemented |
AM0129 # 02 Y:1991 | 02 | 1991 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $746 | $0 | Not Implemented |
AM0129 # 03 Y:1991 | 03 | 1991 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $660 | $755 | Not Implemented |
AM0129 # 04 Y:1991 | 04 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,875 | $32 | Not Implemented |
AM0129 # 05 Y:1991 | 05 | 1991 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $370 | $0 | Not Implemented |
AM0129 # 06 Y:1991 | 06 | 1991 | OPTIMIZE PLANT POWER FACTOR | $2,350 | $2,000 | Not Implemented |
AM0130 # 01 Y:1991 | 01 | 1991 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,280 | $19,700 | Not Implemented |
AM0130 # 02 Y:1991 | 02 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,148 | $653 | Not Implemented |
AM0130 # 03 Y:1991 | 03 | 1991 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $4,979 | $16,000 | Not Implemented |
AM0130 # 04 Y:1991 | 04 | 1991 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $3,370 | $0 | Not Implemented |
AM0130 # 05 Y:1991 | 05 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,161 | $500 | Not Implemented |
AM0130 # 06 Y:1991 | 06 | 1991 | IMPROVE LUBRICATION PRACTICES | $1,109 | $0 | Not Implemented |
AM0130 # 07 Y:1991 | 07 | 1991 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $240 | $0 | Not Implemented |
AM0130 # 08 Y:1991 | 08 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $140 | $55 | Not Implemented |
AM0131 # 01 Y:1991 | 01 | 1991 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,223 | $1,427 | Implemented |
AM0131 # 02 Y:1991 | 02 | 1991 | IMPROVE LUBRICATION PRACTICES | $1,620 | $0 | Implemented |
AM0131 # 03 Y:1991 | 03 | 1991 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,420 | $0 | Implemented |
AM0131 # 04 Y:1991 | 04 | 1991 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $460 | $300 | Implemented |
AM0131 # 05 Y:1991 | 05 | 1991 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $460 | $150 | Implemented |