IAC logo
IAC Assessment: AM0165
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0165
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1992
Principal Product envelopes
NAICS n/a
SIC 2677 - Envelopes
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 125,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 6,312
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $286,959 5,907,093 kWh $0.05
Natural Gas $26,163 5,037 MMBtu $5.19
TOTAL ENERGY COSTS $313,122
RECOMMENDED SAVINGS* $40,645 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $31,350
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.6222 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS Savings:
$23,570
Cost:
$1,350
$23,570 511,430 - - $23,570
511,430
kWh
-
-
MMBtu
02: 2.7292 LOWER CEILING TO REDUCE CONDITIONED SPACE Savings:
$6,300
Cost:
$3,630
- - $6,300 1,216 -
-
kWh
$6,300
1,216
MMBtu
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$3,915
Cost:
$3,450
$8,730 189,332 $(-4,815) (-927) $8,730
189,332
kWh
$(-4,815)
(-927)
MMBtu
04: 2.5123 REDUCE FLUID FLOW RATES Savings:
$2,710
Cost:
-
$2,710 105,803 - - $2,710
105,803
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,750
Cost:
-
$1,750 68,581 - - $1,750
68,581
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,330
Cost:
$2,520
$1,330 29,015 - - $1,330
29,015
kWh
-
-
MMBtu
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$920
Cost:
$920
$920 19,930 - - $920
19,930
kWh
-
-
MMBtu
08: 2.6232 INSTALL SET-BACK TIMERS Savings:
$150
Cost:
$190
$150 5,862 - - $150
5,862
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$40,645
Cost:
$12,060
$39,160 929,953 $1,485 289 $39,160
929,953
kWh
$1,485
289
MMBtu
TOTAL IMPLEMENTED Savings:
$31,350
Cost:
$7,690
$25,050 546,307 $6,300 1,216 $25,050
546,307
kWh
$6,300
1,216
MMBtu
Savings
Cost
$ kWh $ MMBtu