IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0332 # 02 Y:1991 02 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,333 $0 Implemented
UD0332 # 03 Y:1991 03 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,459 $0 Implemented
UD0332 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,479 $0 Implemented
UD0333 # 01 Y:1991 01 1991 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $2,221 $6,000 Implemented
UD0333 # 02 Y:1991 02 1991 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $145,812 $0 Implemented
UD0333 # 03 Y:1991 03 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,976 $0 Implemented
UD0333 # 04 Y:1991 04 1991 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $34,857 $0 Implemented
UD0329 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $17,856 $20,000 Implemented
UD0329 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $5,309 $1,000 Implemented
UD0329 # 03 Y:1990 03 1990 BURN WASTE OIL FOR HEAT $6,067 $0 Implemented
UD0329 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,783 $7,500 Implemented
UD0329 # 05 Y:1990 05 1990 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,223 $6,240 Implemented
UD0321 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,217 $37,000 Implemented
UD0321 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,310 $7,500 Implemented
UD0321 # 03 Y:1990 03 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,760 $1,100 Implemented
UD0321 # 04 Y:1990 04 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,068 $14,000 Not Implemented
UD0318 # 01 Y:1990 01 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,002 $0 Implemented
UD0318 # 02 Y:1990 02 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,804 $500 Implemented
UD0318 # 03 Y:1990 03 1990 RECOVER WASTE HEAT FROM EQUIPMENT $1,306 $300 Implemented
UD0318 # 04 Y:1990 04 1990 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,599 $0 Implemented
UD0318 # 05 Y:1990 05 1990 INSTALL TIMERS AND/OR THERMOSTATS $10,040 $5,000 Not Implemented
UD0318 # 06 Y:1990 06 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,103 $1,680 Implemented
UD0318 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,116 $5,820 Not Implemented
UD0319 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $10,147 $0 Implemented
UD0319 # 02 Y:1990 02 1990 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,320 $0 Implemented