IAC logo
IAC Assessment: UD0378
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0378
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1992
Principal Product FRACTIONAL H.P. MOTORS
NAICS n/a
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 0
Annual Production 1,900,000 Pieces
Production Hrs. Annual 3,500
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $271,923 4,761,430 kWh $0.06
Natural Gas $13,646 3,686 MMBtu $3.70
TOTAL ENERGY COSTS $285,569
RECOMMENDED SAVINGS* $44,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,114
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.6232 INSTALL SET-BACK TIMERS Savings:
$23,156
Cost:
-
$23,156 430,246 $23,156
430,246
kWh
02: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$1,650
Cost:
-
$1,650 19,050 $1,650
19,050
kWh
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,357
Cost:
-
$6,357 - $6,357
-
kWh
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$13,114
Cost:
$14,400
$13,114 194,900 $13,114
194,900
kWh
TOTAL RECOMMENDED Savings:
$44,277
Cost:
$14,400
$44,277 644,196 $44,277
644,196
kWh
TOTAL IMPLEMENTED Savings:
$13,114
Cost:
$14,400
$13,114 194,900 $13,114
194,900
kWh