Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0319 # 03 Y:1990 | 03 | 1990 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $13,053 | $0 | Implemented |
UD0319 # 04 Y:1990 | 04 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,790 | $0 | Implemented |
UD0320 # 01 Y:1990 | 01 | 1990 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $1,650 | $0 | Not Implemented |
UD0320 # 02 Y:1990 | 02 | 1990 | INSTALL SET-BACK TIMERS | $1,090 | $0 | Not Implemented |
UD0320 # 03 Y:1990 | 03 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $1,389 | $4,000 | Not Implemented |
UD0320 # 04 Y:1990 | 04 | 1990 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,361 | $3,000 | Not Implemented |
UD0316 # 01 Y:1990 | 01 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,000 | $0 | Not Implemented |
UD0316 # 02 Y:1990 | 02 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,890 | $0 | Not Implemented |
UD0316 # 03 Y:1990 | 03 | 1990 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,175 | $0 | Not Implemented |
UD0316 # 04 Y:1990 | 04 | 1990 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,611 | $0 | Not Implemented |
UD0316 # 05 Y:1990 | 05 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,186 | $10,000 | Not Implemented |
UD0317 # 01 Y:1990 | 01 | 1990 | MINIMIZE WATER USAGE | $4,564 | $4,200 | Implemented |
UD0317 # 02 Y:1990 | 02 | 1990 | REDESIGN PROCESS | $27,328 | $30,000 | Not Implemented |
UD0317 # 03 Y:1990 | 03 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,080 | $70,000 | Not Implemented |
UD0313 # 01 Y:1990 | 01 | 1990 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $5,744 | $20,000 | Implemented |
UD0313 # 02 Y:1990 | 02 | 1990 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $706 | $700 | Implemented |
UD0313 # 03 Y:1990 | 03 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $260 | $240 | Not Implemented |
UD0313 # 04 Y:1990 | 04 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $2,376 | $25,000 | Implemented |
UD0314 # 01 Y:1990 | 01 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $14,571 | $25,000 | Implemented |
UD0314 # 02 Y:1990 | 02 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,218 | $14,000 | Implemented |
UD0314 # 03 Y:1990 | 03 | 1990 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,489 | $8,000 | Implemented |
UD0314 # 04 Y:1990 | 04 | 1990 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,341 | $6,000 | Not Implemented |
UD0314 # 05 Y:1990 | 05 | 1990 | REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY | $7,638 | $0 | Not Implemented |
UD0314 # 06 Y:1990 | 06 | 1990 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $16,450 | $500 | Not Implemented |
UD0314 # 07 Y:1990 | 07 | 1990 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $8,223 | $33,000 | Implemented |