IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,152

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0125 # 05 Y:1982 05 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $748 $359 Implemented
KU0041 # 01 Y:1982 01 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,933 $0 Not Implemented
KU0041 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,751 $7,500 Implemented
KU0041 # 03 Y:1982 03 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,027 $287 Not Implemented
KU0041 # 04 Y:1982 04 1982 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $738 $1,800 Not Implemented
KU0041 # 05 Y:1982 05 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,547 $0 Not Implemented
KU0041 # 06 Y:1982 06 1982 RECOVER WASTE HEAT FROM EQUIPMENT $1,134 $800 Not Implemented
KU0042 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,306 $1,000 Not Implemented
KU0042 # 02 Y:1982 02 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,980 $0 Not Implemented
KU0042 # 03 Y:1982 03 1982 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,367 $0 Not Implemented
KU0042 # 04 Y:1982 04 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $622 $350 Not Implemented
KU0042 # 05 Y:1982 05 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $398 $140 Not Implemented
KU0043 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,438 $2,000 Not Implemented
KU0043 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $4,890 $4,800 Not Implemented
KU0043 # 03 Y:1982 03 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,989 $550 Not Implemented
KU0043 # 04 Y:1982 04 1982 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $162,065 $20,000 Not Implemented
KU0043 # 05 Y:1982 05 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $20,364 $40,000 Not Implemented
KU0043 # 06 Y:1982 06 1982 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $3,332 $818 Not Implemented
KU0044 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $59,143 $92,496 Implemented
KU0044 # 02 Y:1982 02 1982 INSTALL TIMERS AND/OR THERMOSTATS $6,923 $4,000 Not Implemented
KU0044 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,715 $500 Implemented
KU0044 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,075 $3,000 Implemented
KU0044 # 05 Y:1982 05 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $955 $340 Not Implemented
KU0044 # 06 Y:1982 06 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $309 $60 Not Implemented
KU0045 # 01 Y:1982 01 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $4,404 $6,640 Not Implemented