Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,152
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0125 # 05 Y:1982 | 05 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $748 | $359 | Implemented |
KU0041 # 01 Y:1982 | 01 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,933 | $0 | Not Implemented |
KU0041 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,751 | $7,500 | Implemented |
KU0041 # 03 Y:1982 | 03 | 1982 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $2,027 | $287 | Not Implemented |
KU0041 # 04 Y:1982 | 04 | 1982 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $738 | $1,800 | Not Implemented |
KU0041 # 05 Y:1982 | 05 | 1982 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,547 | $0 | Not Implemented |
KU0041 # 06 Y:1982 | 06 | 1982 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,134 | $800 | Not Implemented |
KU0042 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $29,306 | $1,000 | Not Implemented |
KU0042 # 02 Y:1982 | 02 | 1982 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,980 | $0 | Not Implemented |
KU0042 # 03 Y:1982 | 03 | 1982 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,367 | $0 | Not Implemented |
KU0042 # 04 Y:1982 | 04 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $622 | $350 | Not Implemented |
KU0042 # 05 Y:1982 | 05 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $398 | $140 | Not Implemented |
KU0043 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,438 | $2,000 | Not Implemented |
KU0043 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $4,890 | $4,800 | Not Implemented |
KU0043 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $8,989 | $550 | Not Implemented |
KU0043 # 04 Y:1982 | 04 | 1982 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $162,065 | $20,000 | Not Implemented |
KU0043 # 05 Y:1982 | 05 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $20,364 | $40,000 | Not Implemented |
KU0043 # 06 Y:1982 | 06 | 1982 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $3,332 | $818 | Not Implemented |
KU0044 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $59,143 | $92,496 | Implemented |
KU0044 # 02 Y:1982 | 02 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $6,923 | $4,000 | Not Implemented |
KU0044 # 03 Y:1982 | 03 | 1982 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,715 | $500 | Implemented |
KU0044 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,075 | $3,000 | Implemented |
KU0044 # 05 Y:1982 | 05 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $955 | $340 | Not Implemented |
KU0044 # 06 Y:1982 | 06 | 1982 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $309 | $60 | Not Implemented |
KU0045 # 01 Y:1982 | 01 | 1982 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,404 | $6,640 | Not Implemented |