Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IA0350 # 06 Y:2004 | 06 | 2004 | USE RADIANT HEATER FOR SPOT HEATING | $11,055 | $14,814 | Not Implemented |
IA0350 # 07 Y:2004 | 07 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $626 | $1,600 | Not Implemented |
UF0350 # 01 Y:2004 | 01 | 2004 | DE-ENERGIZE EXCESS TRANSFORMER CAPACITY | $22,657 | $60,000 | Not Implemented |
UF0350 # 02 Y:2004 | 02 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,654 | $10,151 | Implemented |
UF0350 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $17,652 | $1,339 | Not Implemented |
UF0350 # 04 Y:2004 | 04 | 2004 | INSTALL SKYLIGHTS | $12,961 | $9,706 | Implemented |
UF0350 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,068 | $1,610 | Implemented |
UF0350 # 06 Y:2004 | 06 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $563 | $1,750 | Not Implemented |
UF0350 # 07 Y:2004 | 07 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $8,988 | $0 | Not Implemented |
UF0350 # 08 Y:2004 | 08 | 2004 | RECYCLE FLUORESCENT LAMPS | $1,968 | $3,496 | Not Implemented |
UF0350 # 09 Y:2004 | 09 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $4,200 | $0 | Not Implemented |
UF0350 # 10 Y:2004 | 10 | 2004 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,795 | $3,000 | Implemented |
UF0348 # 01 Y:2004 | 01 | 2004 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,333,121 | $2,700,000 | Implemented |
UF0348 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,420 | $29,400 | Implemented |
UF0348 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,249 | $0 | Implemented |
UF0348 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,169 | $10,500 | Implemented |
UF0348 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,420 | $22,100 | Not Implemented |
UF0348 # 06 Y:2004 | 06 | 2004 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $39,206 | $74,000 | Implemented |
UF0348 # 07 Y:2004 | 07 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,366 | $0 | Not Implemented |
UF0348 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,203 | $6,441 | Implemented |
UF0348 # 09 Y:2004 | 09 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,977 | $456 | Implemented |
UF0348 # 10 Y:2004 | 10 | 2004 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $3,760 | $0 | Implemented |
TA0083 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $42,038 | $0 | Not Implemented |
TA0083 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $25,800 | $2,070 | Not Implemented |
TA0083 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,680 | $25 | Not Implemented |