IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0022 # 02 Y:2008 02 2008 MINIMIZE WATER USAGE $18,580 $10,000 Implemented
DL0022 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,452 $38,199 Implemented
DL0022 # 04 Y:2008 04 2008 REPLACE BOILER $39,920 $112,000 Not Implemented
DL0022 # 05 Y:2008 05 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,579 $0 Not Implemented
DL0022 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $1,858 $1,000 Implemented
OR0532 # 01 Y:2008 01 2008 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $4,033 $400 Not Implemented
OR0532 # 02 Y:2008 02 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,101 $2,697 Not Implemented
OR0532 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $4,068 $13,244 Not Implemented
OR0532 # 04 Y:2008 04 2008 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $27,532 $49,504 Not Implemented
OR0532 # 05 Y:2008 05 2008 OPTIMIZE PLANT POWER FACTOR $13,750 $20,650 Not Implemented
OR0532 # 06 Y:2008 06 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $1,195 $0 Not Implemented
UA0025 # 01 Y:2008 01 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,844 $1,500 Implemented
UA0025 # 02 Y:2008 02 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,469 $0 Not Implemented
UA0025 # 03 Y:2008 03 2008 USE OPTIMUM THICKNESS INSULATION $5,715 $3,500 Not Implemented
UA0025 # 04 Y:2008 04 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $43,433 $13,600 Not Implemented
UA0025 # 05 Y:2008 05 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,216 $7,928 Not Implemented
UA0025 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,007 $37,179 Not Implemented
NC0381 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $80,420 $183,000 Not Implemented
NC0381 # 02 Y:2008 02 2008 REPLACE BOILER $34,528 $60,000 Not Implemented
NC0381 # 03 Y:2008 03 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $1,430 $800 Implemented
NC0381 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $1,224 $1,030 Implemented
NC0381 # 05 Y:2008 05 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $998 $500 Implemented
NC0381 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,183 $4,900 Not Implemented
NC0381 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,016 $100 Implemented
NC0381 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,562 $1,472 Not Implemented