IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0523 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $5,347 $1,000 Implemented
WI0523 # 04 Y:2006 04 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,880 $0 Not Implemented
WI0523 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,735 $800 Not Implemented
WI0523 # 06 Y:2006 06 2006 USE SYNTHETIC LUBRICANT $1,970 $0 Implemented
OK0736 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $224,746 $154,440 Implemented
OK0736 # 02 Y:2006 02 2006 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $447,023 $299,500 Not Implemented
OK0736 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $29,250 $20,340 Implemented
OK0736 # 04 Y:2006 04 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,438 $765 Implemented
OK0736 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,322 $1,267 Implemented
OK0736 # 06 Y:2006 06 2006 USE PHOTOCELL CONTROLS $3,268 $225 Not Implemented
UF0391 # 01 Y:2006 01 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,522 $41,500 Not Implemented
UF0391 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $2,932 $0 Implemented
UF0391 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,054 $403 Implemented
UF0391 # 04 Y:2006 04 2006 REPAIR AND ELIMINATE STEAM LEAKS $8,241 $404 Implemented
UF0391 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,679 $0 Implemented
UF0391 # 06 Y:2006 06 2006 CLOSE OFF UNNEEDED STEAM LINES $9,659 $0 Implemented
UF0391 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,307 $10,651 Not Implemented
UF0391 # 08 Y:2006 08 2006 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $803 $0 Implemented
UF0391 # 09 Y:2006 09 2006 USE OPTIMUM THICKNESS INSULATION $325 $84 Implemented
UF0391 # 10 Y:2006 10 2006 USE OPTIMUM THICKNESS INSULATION $324 $372 Not Implemented
UF0391 # 11 Y:2006 11 2006 INSTALL OCCUPANCY SENSORS $286 $228 Not Implemented
UF0391 # 12 Y:2006 12 2006 USE PHOTOCELL CONTROLS $1,978 $30 Implemented
UF0391 # 13 Y:2006 13 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $63,455 $0 Not Implemented
UF0391 # 14 Y:2006 14 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $83,200 $5,350 Not Implemented
UF0391 # 15 Y:2006 15 2006 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $17,472 $0 Not Implemented