IAC logo
IAC Assessment: UF0391
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0391
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2006
Principal Product Corrugated board containers
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales n/a
# of Employees 120
Plant Area (Sq.Ft.) 294,000
Annual Production 1,000,000,000 Units
Production Hrs. Annual 6,656
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $722,095 846,151 kWh $0.85
Electricity Demand $132,163 17,283 kW-months/year $7.65
Natural Gas $1,009,694 89,507 MMBtu $11.28
TOTAL ENERGY COSTS $1,863,952
RECOMMENDED SAVINGS* $239,557 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $28,671
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$24,522
Cost:
$41,500
$21,714 133,563 $2,808 31 - - - - - - $21,714
133,563
kWh
$2,808
31
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$2,932
Cost:
-
$2,336 33,855 $596 7 - - - - - - $2,336
33,855
kWh
$596
7
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,054
Cost:
$403
$3,054 35,933 - - - - - - - - $3,054
35,933
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$8,241
Cost:
$404
- - - - $8,241 729 - - - - -
-
kWh
-
-
kW-months/year
$8,241
729
MMBtu
-
-
lb
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,679
Cost:
-
$1,679 19,749 - - - - - - - - $1,679
19,749
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.2153 CLOSE OFF UNNEEDED STEAM LINES Savings:
$9,659
Cost:
-
- - - - $9,659 855 - - - - -
-
kWh
-
-
kW-months/year
$9,659
855
MMBtu
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$11,307
Cost:
$10,651
$9,288 135,084 $2,019 22 - - - - - - $9,288
135,084
kWh
$2,019
22
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$803
Cost:
-
$803 11,638 - - - - - - - - $803
11,638
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$325
Cost:
$84
- - - - $325 29 - - - - -
-
kWh
-
-
kW-months/year
$325
29
MMBtu
-
-
lb
-
-
$
10: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$324
Cost:
$372
- - - - $324 29 - - - - -
-
kWh
-
-
kW-months/year
$324
29
MMBtu
-
-
lb
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$286
Cost:
$228
$286 4,140 - - - - - - - - $286
4,140
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
12: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,978
Cost:
$30
$1,143 16,562 $835 9 - - - - - - $1,143
16,562
kWh
$835
9
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
13: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$63,455
Cost:
-
$57,481 833,031 $5,974 65 - - - - - - $57,481
833,031
kWh
$5,974
65
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
14: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$83,200
Cost:
$5,350
- - - - - - $83,200 360,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$83,200
360,000
lb
-
-
$
15: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$17,472
Cost:
-
- - - - - - $17,472 87,360 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$17,472
87,360
lb
-
-
$
16: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$10,320
Cost:
-
- - - - - - - - $10,320 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$10,320
-
$
TOTAL RECOMMENDED Savings:
$239,557
Cost:
$59,022
$97,784 1,223,555 $12,232 134 $18,549 1,642 $100,672 447,360 $10,320 - $97,784
1,223,555
kWh
$12,232
134
kW-months/year
$18,549
1,642
MMBtu
$100,672
447,360
lb
$10,320
-
$
TOTAL IMPLEMENTED Savings:
$28,671
Cost:
$921
$9,015 117,737 $1,431 16 $18,225 1,613 - - - - $9,015
117,737
kWh
$1,431
16
kW-months/year
$18,225
1,613
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Raw Material