IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0243 # 09 Y:2006 09 2006 INSTALL OCCUPANCY SENSORS $995 $525 Not Implemented
LE0243 # 10 Y:2006 10 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,687 $7,500 Not Implemented
LE0239 # 01 Y:2006 01 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $392,390 $95,000 Not Implemented
LE0239 # 02 Y:2006 02 2006 REPAIR AND ELIMINATE STEAM LEAKS $280,038 $31,000 Not Implemented
LE0239 # 03 Y:2006 03 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $204,235 $200,000 Not Implemented
LE0239 # 04 Y:2006 04 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $115,069 $20,000 Not Implemented
LE0239 # 05 Y:2006 05 2006 COVER OPEN TANKS $23,836 $30,000 Not Implemented
LE0239 # 06 Y:2006 06 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,473 $28,000 Not Implemented
LE0239 # 07 Y:2006 07 2006 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $10,599 $7,500 Not Implemented
LE0239 # 08 Y:2006 08 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $4,312 $2,528 Not Implemented
LE0239 # 09 Y:2006 09 2006 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,132 $6,000 Not Implemented
LE0239 # 10 Y:2006 10 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $355 $500 Not Implemented
LE0240 # 01 Y:2006 01 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $265,405 $500,000 Implemented
LE0240 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $74,790 $800 Not Implemented
LE0240 # 03 Y:2006 03 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $18,974 $2,092 Implemented
LE0240 # 04 Y:2006 04 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,308 $2,500 Implemented
LE0240 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,178 $4,500 Implemented
LE0240 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,994 $500 Implemented
LE0240 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $331 $300 Implemented
LE0240 # 08 Y:2006 08 2006 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $192 $300 Implemented
LE0240 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,770 $139,872 Not Implemented
LE0217 # 01 Y:2005 01 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $33,752 $27,000 Not Implemented
LE0217 # 02 Y:2005 02 2005 KEEP EQUIPMENT CLEAN $28,000 $840 Implemented
LE0217 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $16,487 $6,845 Implemented
LE0217 # 04 Y:2005 04 2005 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,186 $3,000 Not Implemented