IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0571 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,616 $2,200 Implemented
OR0571 # 04 Y:2011 04 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,906 $7,000 Implemented
OR0571 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $989 $2,400 Not Implemented
OR0571 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,292 $44,400 Implemented
OR0571 # 07 Y:2011 07 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,940 $12,340 Not Implemented
OR0571 # 08 Y:2011 08 2011 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $285,000 $626,000 Not Implemented
OR0569 # 01 Y:2011 01 2011 USE OPTIMUM TEMPERATURE $9,149 $450 Implemented
OR0569 # 02 Y:2011 02 2011 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,650 $700 Implemented
OR0569 # 03 Y:2011 03 2011 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,890 $500 Not Implemented
OR0569 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $517 $517 Implemented
OR0569 # 05 Y:2011 05 2011 INSTALL OCCUPANCY SENSORS $17,900 $58,500 Implemented
OR0569 # 06 Y:2011 06 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $10,600 $38,900 Not Implemented
OR0568 # 01 Y:2011 01 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,790 $2,100 Not Implemented
OR0568 # 02 Y:2011 02 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,800 $1,390 Not Implemented
OR0568 # 03 Y:2011 03 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,189 $2,050 Not Implemented
OR0568 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $152,958 $711,732 Not Implemented
OR0568 # 05 Y:2011 05 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,940 $10,000 Not Implemented
OR0567 # 01 Y:2011 01 2011 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $2,000 $1,510 Implemented
OR0567 # 02 Y:2011 02 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,491 $8,300 Not Implemented
OR0567 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $878 $737 Not Implemented
OR0567 # 04 Y:2011 04 2011 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,800 $6,700 Not Implemented
OR0567 # 05 Y:2011 05 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,000 $5,580 Implemented
OR0567 # 06 Y:2011 06 2011 INSULATE BARE EQUIPMENT $1,248 $2,547 Implemented
OR0567 # 07 Y:2011 07 2011 ELIMINATE/REDUCE AN OPERATION $17,603 $2,480 Not Implemented
OR0566 # 01 Y:2011 01 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,230 $635 Implemented