IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0076 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $427 $250 Not Implemented
UD0076 # 03 Y:1983 03 1983 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $990 $438 Not Implemented
UD0079 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,269 $548 Not Implemented
UD0079 # 02 Y:1983 02 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,212 $1,000 Not Implemented
UD0080 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,599 $1,472 Not Implemented
UD0080 # 02 Y:1983 02 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $13,125 $53,100 Not Implemented
UD0080 # 03 Y:1983 03 1983 INSTALL STORM WINDOWS AND DOORS $12,524 $20,450 Not Implemented
UD0080 # 04 Y:1983 04 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,981 $7,000 Not Implemented
UD0081 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $424 $341 Implemented
UD0081 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,911 $0 Implemented
UD0081 # 03 Y:1983 03 1983 INSULATE BARE EQUIPMENT $3,417 $188 Implemented
UD0082 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $206 Not Implemented
UD0082 # 02 Y:1983 02 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $170 $0 Not Implemented
UD0082 # 03 Y:1983 03 1983 INSULATE BARE EQUIPMENT $922 $1,200 Not Implemented
UD0082 # 04 Y:1983 04 1983 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,811 $0 Not Implemented
UD0083 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,525 $1,420 Not Implemented
UD0083 # 02 Y:1983 02 1983 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,112 $1,536 Not Implemented
UD0083 # 03 Y:1983 03 1983 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $19,252 $70,000 Not Implemented
UD0084 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,160 $1,527 Not Implemented
UD0084 # 02 Y:1983 02 1983 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,999 $1,500 Not Implemented
UD0084 # 03 Y:1983 03 1983 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,060 $1,000 Not Implemented
UD0084 # 04 Y:1983 04 1983 INSTALL STORM WINDOWS AND DOORS $4,907 $6,932 Not Implemented
UD0084 # 05 Y:1983 05 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,800 $8,000 Not Implemented
UD0085 # 01 Y:1983 01 1983 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $142 $0 Not Implemented
UD0085 # 02 Y:1983 02 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,015 $200 Not Implemented