IAC Assessment: UD0131
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0131
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1984
Principal Product AUTOMOTIVE TRIM
NAICS n/a
SIC 3465 - Automotive Stampings
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 6,000
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $197,134 3,005,276 kWh $0.07
Natural Gas $204,292 36,583 MMBtu $5.58
TOTAL ENERGY COSTS $401,426
RECOMMENDED SAVINGS* $36,587 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,587
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$7,171
Cost:
-
$7,171 9,086 - - $7,171
9,086
kWh
-
-
MMBtu
02: 2.7421 REDUCE GLAZED AREAS IN BUILDINGS Savings:
$17,464
Cost:
$50,000
- - $17,464 3,119 -
-
kWh
$17,464
3,119
MMBtu
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$3,070
Cost:
$8,000
$3,070 30,774 - - $3,070
30,774
kWh
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,853
Cost:
$800
$1,853 29,015 - - $1,853
29,015
kWh
-
-
MMBtu
05: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$2,576
Cost:
$4,000
- - $2,576 460 -
-
kWh
$2,576
460
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,453
Cost:
$20,000
- - $4,453 795 -
-
kWh
$4,453
795
MMBtu
TOTAL RECOMMENDED Savings:
$36,587
Cost:
$82,800
$12,094 68,875 $24,493 4,374 $12,094
68,875
kWh
$24,493
4,374
MMBtu
TOTAL IMPLEMENTED Savings:
$36,587
Cost:
$82,800
$12,094 68,875 $24,493 4,374 $12,094
68,875
kWh
$24,493
4,374
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas