IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0011 # 06 Y:1990 06 1990 KEEP LAMPS AND REFLECTORS CLEAN $22,971 $19,955 Implemented
AS0011 # 07 Y:1990 07 1990 INSTALL SET-BACK TIMERS $1,974 $825 Not Implemented
AS0011 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,567 $5,850 Implemented
AS0011 # 09 Y:1990 09 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $353 $400 Implemented
OK0319 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,141 $5,687 Implemented
OK0319 # 02 Y:1990 02 1990 RECOVER WASTE HEAT FROM EQUIPMENT $4,868 $2,380 Implemented
OK0319 # 03 Y:1990 03 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $59 $0 Not Implemented
OK0319 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,179 $0 Not Implemented
OK0319 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,512 $0 Implemented
OK0319 # 06 Y:1990 06 1990 INSTALL TIMERS AND/OR THERMOSTATS $708 $900 Implemented
OR0089 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,753 $8,531 Not Implemented
OR0089 # 02 Y:1990 02 1990 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $14,100 $5,000 Implemented
OR0089 # 03 Y:1990 03 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $96 $181 Not Implemented
OR0090 # 01 Y:1990 01 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $64,713 $5,000 Implemented
OR0090 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $412 $509 Implemented
OR0090 # 03 Y:1990 03 1990 INSULATE BARE EQUIPMENT $1,562 $3,277 Not Implemented
OR0090 # 04 Y:1990 04 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,098 $2,400 Not Implemented
OR0090 # 05 Y:1990 05 1990 OPTIMIZE PLANT POWER FACTOR $687 $1,950 Not Implemented
OR0090 # 06 Y:1990 06 1990 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,669 $22,569 Not Implemented
WI0095 # 01 Y:1990 01 1990 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $6,294 $4,750 Implemented
WI0095 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,974 $500 Not Implemented
WI0095 # 03 Y:1990 03 1990 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,889 $10,000 Not Implemented
WI0095 # 04 Y:1990 04 1990 INSTALL SET-BACK TIMERS $529 $400 Not Implemented
WI0095 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $276 $0 Implemented
WI0095 # 06 Y:1990 06 1990 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $122 $141 Not Implemented