Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,417
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0011 # 06 Y:1990 | 06 | 1990 | KEEP LAMPS AND REFLECTORS CLEAN | $22,971 | $19,955 | Implemented |
AS0011 # 07 Y:1990 | 07 | 1990 | INSTALL SET-BACK TIMERS | $1,974 | $825 | Not Implemented |
AS0011 # 08 Y:1990 | 08 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,567 | $5,850 | Implemented |
AS0011 # 09 Y:1990 | 09 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $353 | $400 | Implemented |
OK0319 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,141 | $5,687 | Implemented |
OK0319 # 02 Y:1990 | 02 | 1990 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,868 | $2,380 | Implemented |
OK0319 # 03 Y:1990 | 03 | 1990 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $59 | $0 | Not Implemented |
OK0319 # 04 Y:1990 | 04 | 1990 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,179 | $0 | Not Implemented |
OK0319 # 05 Y:1990 | 05 | 1990 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,512 | $0 | Implemented |
OK0319 # 06 Y:1990 | 06 | 1990 | INSTALL TIMERS AND/OR THERMOSTATS | $708 | $900 | Implemented |
OR0089 # 01 Y:1990 | 01 | 1990 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,753 | $8,531 | Not Implemented |
OR0089 # 02 Y:1990 | 02 | 1990 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $14,100 | $5,000 | Implemented |
OR0089 # 03 Y:1990 | 03 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $96 | $181 | Not Implemented |
OR0090 # 01 Y:1990 | 01 | 1990 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $64,713 | $5,000 | Implemented |
OR0090 # 02 Y:1990 | 02 | 1990 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $412 | $509 | Implemented |
OR0090 # 03 Y:1990 | 03 | 1990 | INSULATE BARE EQUIPMENT | $1,562 | $3,277 | Not Implemented |
OR0090 # 04 Y:1990 | 04 | 1990 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $1,098 | $2,400 | Not Implemented |
OR0090 # 05 Y:1990 | 05 | 1990 | OPTIMIZE PLANT POWER FACTOR | $687 | $1,950 | Not Implemented |
OR0090 # 06 Y:1990 | 06 | 1990 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $6,669 | $22,569 | Not Implemented |
WI0095 # 01 Y:1990 | 01 | 1990 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $6,294 | $4,750 | Implemented |
WI0095 # 02 Y:1990 | 02 | 1990 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,974 | $500 | Not Implemented |
WI0095 # 03 Y:1990 | 03 | 1990 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,889 | $10,000 | Not Implemented |
WI0095 # 04 Y:1990 | 04 | 1990 | INSTALL SET-BACK TIMERS | $529 | $400 | Not Implemented |
WI0095 # 05 Y:1990 | 05 | 1990 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $276 | $0 | Implemented |
WI0095 # 06 Y:1990 | 06 | 1990 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $122 | $141 | Not Implemented |