IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,703

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0526 # 04 Y:2014 04 2014 RECOVER WASTE HEAT FROM EQUIPMENT $3,627 $10,000 Not Implemented
NC0526 # 05 Y:2014 05 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $576 $100 Implemented
NC0526 # 06 Y:2014 06 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $134 $150 Not Implemented
NC0526 # 07 Y:2014 07 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,791 $8,593 Implemented
NC0526 # 08 Y:2014 08 2014 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,294 $1,438 Not Implemented
NC0526 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $343 $240 Implemented
NC0526 # 10 Y:2014 10 2014 INSTALL OCCUPANCY SENSORS $1,371 $5,355 Not Implemented
NC0526 # 11 Y:2014 11 2014 DEVELOP A REPAIR/REPLACE POLICY $561 $2,577 Implemented
UK1405 # 01 Y:2014 01 2014 USE OTHER WASTE CONCENTRATION METHODS $200,000 $0 Not Implemented
UK1405 # 02 Y:2014 02 2014 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $194,446 $20,000 Not Implemented
UK1405 # 03 Y:2014 03 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $33,427 $0 Not Implemented
UK1405 # 04 Y:2014 04 2014 PREHEAT COMBUSTION AIR WITH WASTE HEAT $32,296 $39,600 Implemented
UK1405 # 05 Y:2014 05 2014 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $28,307 $0 Not Implemented
UK1405 # 06 Y:2014 06 2014 REPAIR AND ELIMINATE STEAM LEAKS $27,426 $2,678 Implemented
UK1405 # 07 Y:2014 07 2014 OPTIMIZE PLANT POWER FACTOR $20,457 $15,610 Implemented
UK1405 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,745 $46,464 Implemented
UK1405 # 09 Y:2014 09 2014 RECOVER WASTE HEAT FROM EQUIPMENT $15,146 $1,540 Implemented
UK1405 # 10 Y:2014 10 2014 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,374 $24,100 Implemented
UK1405 # 11 Y:2014 11 2014 UPGRADE CONTROLS ON COMPRESSORS $8,300 $25,000 Not Implemented
UK1405 # 12 Y:2014 12 2014 INSULATE FEEDWATER TANK $3,480 $1,769 Implemented
UK1405 # 13 Y:2014 13 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,369 $0 Not Implemented
UK1405 # 14 Y:2014 14 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $103 $30 Implemented
OR0635 # 01 Y:2014 01 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,475 $7,174 Not Implemented
OR0635 # 02 Y:2014 02 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,287 $1,628 Not Implemented
OR0635 # 03 Y:2014 03 2014 INCREASE AMOUNT OF CONDENSATE RETURNED $56,191 $56,191 Not Implemented