IAC logo
IAC Assessment: OR0635
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0635
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 2014
Principal Product Plywood and LVL
NAICS 321212 - Softwood Veneer and Plywood Manufacturing
SIC 2436 - Softwood Veneer And Plywood
Sales $50,000,000-$100,000,000
# of Employees 317
Plant Area (Sq.Ft.) 450,000
Annual Production 120,000,000 Units
Production Hrs. Annual 4,992
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,128,644 21,416,400 kWh $0.05
Electricity Demand $294,462 40,898 kW-months/year $7.20
Electricity Fees $2,520 - $ -
LPG $173,372 9,592 MMBtu $18.07
TOTAL ENERGY COSTS $1,598,998
RECOMMENDED SAVINGS* $352,579 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Water Consumption
$ kWh $ kW-months/year $ $ $ $ $ Tgal
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$29,475
Cost:
$7,174
$29,475 561,751 - - - - - - - - $29,475
561,751
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,287
Cost:
$1,628
$6,287 119,816 - - - - - - - - $6,287
119,816
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
03: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$56,191
Cost:
$56,191
- - - - - - - - $56,191 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$56,191
-
Tgal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,844
Cost:
$15,843
$12,337 234,090 $2,507 348 - - - - - - $12,337
234,090
kWh
$2,507
348
kW-months/year
-
-
$
-
-
$
-
-
Tgal
05: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$23,961
Cost:
$9,068
$23,961 454,665 - - - - - - - - $23,961
454,665
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
06: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$181,002
Cost:
$170,561
$130,333 2,473,114 $17,393 2,416 $3,381 - $29,895 - - - $130,333
2,473,114
kWh
$17,393
2,416
kW-months/year
$3,381
-
$
$29,895
-
$
-
-
Tgal
07: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$40,819
Cost:
$43,800
$45,531 863,970 $(-4,712) (-654) - - - - - - $45,531
863,970
kWh
$(-4,712)
(-654)
kW-months/year
-
-
$
-
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$352,579
Cost:
$304,265
$247,924 4,707,406 $15,188 2,110 $3,381 - $29,895 - $56,191 - $247,924
4,707,406
kWh
$15,188
2,110
kW-months/year
$3,381
-
$
$29,895
-
$
$56,191
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ Tgal
Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Water Consumption Electricity Usage Electricity Demand Administrative Changes Ancillary Material Cost Water Consumption