IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0521 # 07 Y:2022 07 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,254 $800 Implemented
SU0520 # 01 Y:2022 01 2022 USE SYNTHETIC LUBRICANT $540 $0 Not Implemented
SU0520 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,448 $758 Not Implemented
SU0520 # 03 Y:2022 03 2022 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $147,518 $63,000 Not Implemented
SU0520 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,573 $5,527 Not Implemented
SU0520 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,727 $4,920 Not Implemented
SU0520 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $557 $882 Not Implemented
SU0520 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $173 $831 Not Implemented
UW2205 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,244 $12,938 Implemented
UW2205 # 02 Y:2022 02 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $169 $838 Not Implemented
UW2205 # 03 Y:2022 03 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,984 $15,999 Implemented
CI0001 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $27,056 $750 Implemented
CI0001 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $16,299 $3,500 Not Implemented
CI0001 # 03 Y:2022 03 2022 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $5,122 $6,000 Not Implemented
CI0001 # 04 Y:2022 04 2022 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,151 $100 Not Implemented
CI0001 # 05 Y:2022 05 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,000 $5,000 Not Implemented
CI0001 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,304 $25 Not Implemented
CI0001 # 07 Y:2022 07 2022 USE PHOTOCELL CONTROLS $1,147 $1,440 Not Implemented
WV0631 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $30,923 $89,840 Not Implemented
WV0631 # 02 Y:2022 02 2022 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $22,924 $32,450 Not Implemented
WV0631 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,513 $4,998 Implemented
WV0631 # 04 Y:2022 04 2022 UPGRADE CONTROLS ON COMPRESSORS $2,204 $1,911 Not Implemented
WV0631 # 05 Y:2022 05 2022 DEVELOP A REPAIR/REPLACE POLICY $1,092 $1,292 Implemented
WV0631 # 06 Y:2022 06 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $560 $1,500 Implemented
ORC004 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $390 Not Implemented