IAC logo
IAC Assessment: SU0520
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0520
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2022
Principal Product Steel Fabrication
NAICS 332322 - Sheet Metal Work Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 64
Plant Area (Sq.Ft.) 122,186
Annual Production 100,000 Units
Production Hrs. Annual 7,300
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,912 1,608,956 kWh $0.04
Electricity Demand $64,451 5,647 kW-months/year $11.41
Electricity Fees $13,172 - $ -
Natural Gas $55,824 11,587 MMBtu $4.82
TOTAL ENERGY COSTS $193,358
RECOMMENDED SAVINGS* $166,537 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$540
Cost:
-
$226 6,092 $315 28 - - - - $226
6,092
kWh
$315
28
kW-months/year
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,448
Cost:
$758
- - $6,448 565 - - - - -
-
kWh
$6,448
565
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$147,518
Cost:
$63,000
$(-7,109) (-191,100) - - - - $154,627 - $(-7,109)
(-191,100)
kWh
-
-
kW-months/year
-
-
MMBtu
$154,627
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,573
Cost:
$5,527
$4,890 131,450 $2,466 216 - - $217 - $4,890
131,450
kWh
$2,466
216
kW-months/year
-
-
MMBtu
$217
-
$
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$3,727
Cost:
$4,920
$(-69) (-1,850) - - $3,796 788 - - $(-69)
(-1,850)
kWh
-
-
kW-months/year
$3,796
788
MMBtu
-
-
$
06: 2.7314 REDUCE VENTILATION AIR Savings:
$557
Cost:
$882
$227 6,114 - - $329 68 - - $227
6,114
kWh
-
-
kW-months/year
$329
68
MMBtu
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$173
Cost:
$831
$173 4,677 - - - - - - $173
4,677
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$166,537
Cost:
$75,918
$(-1,662) (-44,617) $9,229 809 $4,125 856 $154,845 - $(-1,662)
(-44,617)
kWh
$9,229
809
kW-months/year
$4,125
856
MMBtu
$154,845
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost