Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0049 # 05 Y:1982 | 05 | 1982 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $7,008 | $7,500 | Implemented |
UD0050 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,891 | $396 | Not Implemented |
UD0050 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,817 | $400 | Implemented |
UD0050 # 03 Y:1982 | 03 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,054 | $2,800 | Not Implemented |
UD0050 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,051 | $5,156 | Implemented |
UD0050 # 05 Y:1982 | 05 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $233 | $0 | Not Implemented |
UD0051 # 01 Y:1982 | 01 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $460 | $0 | Implemented |
UD0051 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,295 | $753 | Implemented |
UD0051 # 03 Y:1982 | 03 | 1982 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $4,219 | $6,160 | Implemented |
UD0051 # 04 Y:1982 | 04 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,504 | $900 | Implemented |
UD0051 # 05 Y:1982 | 05 | 1982 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $3,312 | $1,500 | Not Implemented |
UD0052 # 01 Y:1982 | 01 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,538 | $900 | Not Implemented |
UD0052 # 02 Y:1982 | 02 | 1982 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $182,775 | $87,000 | Not Implemented |
UD0052 # 03 Y:1982 | 03 | 1982 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $27,811 | $0 | Not Implemented |
UD0053 # 01 Y:1982 | 01 | 1982 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $3,281 | $2,500 | Not Implemented |
UD0053 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,215 | $498 | Not Implemented |
UD0053 # 03 Y:1982 | 03 | 1982 | REDUCE GLAZED AREAS IN BUILDINGS | $4,533 | $5,752 | Not Implemented |
UD0053 # 04 Y:1982 | 04 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $7,670 | $92,250 | Implemented |
UD0044 # 01 Y:1982 | 01 | 1982 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $4,962 | $2,000 | Not Implemented |
UD0045 # 01 Y:1982 | 01 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $229 | $400 | Implemented |
UD0045 # 02 Y:1982 | 02 | 1982 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $4,586 | $7,000 | Implemented |
UD0045 # 03 Y:1982 | 03 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,451 | $3,100 | Implemented |
UD0046 # 01 Y:1982 | 01 | 1982 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $595 | $0 | Not Implemented |
UD0046 # 02 Y:1982 | 02 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,862 | $60,027 | Not Implemented |
UD0046 # 03 Y:1982 | 03 | 1982 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,172 | $500 | Not Implemented |