Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,100
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0233 # 04 Y:2024 | 04 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $7,260 | $30,000 | Not Implemented |
DL0233 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM TEMPERATURE | $769 | $1,439 | Implemented |
DL0233 # 02 Y:2024 | 02 | 2024 | USE OPTIMUM TEMPERATURE | $516 | $0 | Implemented |
DL0233 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $265 | $0 | Implemented |
DL0232 # 18 Y:2024 | 18 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,092 | $10,000 | Implemented |
DL0232 # 17 Y:2024 | 17 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,477 | $2,488 | Implemented |
DL0232 # 16 Y:2024 | 16 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $14,220 | $30,000 | Implemented |
DL0232 # 15 Y:2024 | 15 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $6,886 | $20,000 | Implemented |
DL0232 # 14 Y:2024 | 14 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,758 | $1,500 | Implemented |
DL0232 # 13 Y:2024 | 13 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,930 | $7,995 | Implemented |
DL0232 # 12 Y:2024 | 12 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,886 | $5,000 | Implemented |
DL0232 # 11 Y:2024 | 11 | 2024 | INSULATE BARE EQUIPMENT | $500 | $340 | Implemented |
DL0232 # 10 Y:2024 | 10 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $546 | $0 | Implemented |
DL0232 # 09 Y:2024 | 09 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,568 | $10,000 | Implemented |
DL0232 # 08 Y:2024 | 08 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,946 | $10,000 | Implemented |
DL0232 # 07 Y:2024 | 07 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,850 | $1,637 | Implemented |
DL0232 # 06 Y:2024 | 06 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $7,288 | $84 | Implemented |
DL0232 # 05 Y:2024 | 05 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $10,552 | $112 | Implemented |
DL0232 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,563 | $0 | Implemented |
DL0232 # 03 Y:2024 | 03 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $848 | $0 | Implemented |
DL0232 # 02 Y:2024 | 02 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $4,060 | $166 | Implemented |
DL0232 # 01 Y:2024 | 01 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $1,952 | $0 | Implemented |
DL0229 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $104,868 | $500,000 | Not Implemented |
DL0229 # 05 Y:2023 | 05 | 2023 | USE HEAT PUMP FOR SPACE CONDITIONING | $2,948 | $14,000 | Not Implemented |
DL0229 # 04 Y:2023 | 04 | 2023 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $44,923 | $1,275 | Not Implemented |