IAC Assessment: DL0232
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: DL0232
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Delaware
Assessment Year 2024
Principal Product Plastic Sheets
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 104,000
Annual Production 100,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $204,439 2,348,707 kWh $0.09
Electricity Demand $52,084 5,148 kW-months/year $10.12
Electricity Fees $10,702 - $ -
LPG $29,570 1,777 MMBtu $16.64
TOTAL ENERGY COSTS $296,795
RECOMMENDED SAVINGS* $92,922 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $92,922
#|Description Savings
Cost
Status Electricity Usage LPG Electricity Usage LPG
$ kWh $ MMBtu
01: 2.7311 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE Savings:
$1,952
Cost:
-
$391 3,586 $1,561 94 $391
3,586
kWh
$1,561
94
MMBtu
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,060
Cost:
$166
- - $4,060 244 -
-
kWh
$4,060
244
MMBtu
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$848
Cost:
-
$848 7,775 - - $848
7,775
kWh
-
-
MMBtu
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,563
Cost:
-
$1,563 14,342 - - $1,563
14,342
kWh
-
-
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,552
Cost:
$112
$7,823 71,775 $2,729 164 $7,823
71,775
kWh
$2,729
164
MMBtu
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,288
Cost:
$84
$1,830 16,788 $5,458 328 $1,830
16,788
kWh
$5,458
328
MMBtu
07: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$2,850
Cost:
$1,637
$2,850 26,147 - - $2,850
26,147
kWh
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,946
Cost:
$10,000
$231 2,118 $2,715 163 $231
2,118
kWh
$2,715
163
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,568
Cost:
$10,000
- - $9,568 575 -
-
kWh
$9,568
575
MMBtu
10: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$546
Cost:
-
$546 5,008 - - $546
5,008
kWh
-
-
MMBtu
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$500
Cost:
$340
$500 4,590 - - $500
4,590
kWh
-
-
MMBtu
12: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$5,886
Cost:
$5,000
$5,886 54,000 - - $5,886
54,000
kWh
-
-
MMBtu
13: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,930
Cost:
$7,995
$4,930 45,229 - - $4,930
45,229
kWh
-
-
MMBtu
14: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$9,758
Cost:
$1,500
$9,758 89,520 - - $9,758
89,520
kWh
-
-
MMBtu
15: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,886
Cost:
$20,000
$6,886 63,177 - - $6,886
63,177
kWh
-
-
MMBtu
16: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$14,220
Cost:
$30,000
$14,220 130,455 - - $14,220
130,455
kWh
-
-
MMBtu
17: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,477
Cost:
$2,488
$4,477 41,075 - - $4,477
41,075
kWh
-
-
MMBtu
18: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,092
Cost:
$10,000
$4,092 37,538 - - $4,092
37,538
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$92,922
Cost:
$99,322
$66,831 613,123 $26,091 1,568 $66,831
613,123
kWh
$26,091
1,568
MMBtu
TOTAL IMPLEMENTED Savings:
$92,922
Cost:
$99,322
$66,831 613,123 $26,091 1,568 $66,831
613,123
kWh
$26,091
1,568
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage LPG Electricity Usage LPG