Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,399
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0028 # 08 Y:2023 | 08 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,138 | $6,000 | n/a |
CC0028 # 07 Y:2023 | 07 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,053 | $18,871 | n/a |
CC0028 # 06 Y:2023 | 06 | 2023 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $7,824 | $12,573 | n/a |
CC0028 # 05 Y:2023 | 05 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,311 | $0 | n/a |
CC0028 # 04 Y:2023 | 04 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $8,063 | $20,000 | n/a |
CC0028 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $3,687 | $5,300 | n/a |
CC0028 # 02 Y:2023 | 02 | 2023 | INSULATE FEEDWATER TANK | $1,517 | $700 | n/a |
CC0028 # 01 Y:2023 | 01 | 2023 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,157 | $3,110 | n/a |
CC0027 # 08 Y:2023 | 08 | 2023 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $27,290 | $782,250 | n/a |
CC0027 # 07 Y:2023 | 07 | 2023 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $91 | $600 | n/a |
CC0027 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $7,831 | $93,870 | n/a |
CC0027 # 05 Y:2023 | 05 | 2023 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $26,412 | $80,000 | n/a |
CC0027 # 04 Y:2023 | 04 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,831 | $10,000 | n/a |
CC0027 # 03 Y:2023 | 03 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,571 | $25,000 | n/a |
CC0027 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $176 | $351 | n/a |
CC0027 # 01 Y:2023 | 01 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,444 | $8,455 | n/a |
CC0026 # 04 Y:2023 | 04 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $452 | $966 | n/a |
CC0026 # 01 Y:2023 | 01 | 2023 | INSULATE FEEDWATER TANK | $443 | $834 | n/a |
CC0026 # 02 Y:2023 | 02 | 2023 | INSTALL / REPAIR INSULATION ON STEAM LINES | $620 | $3,033 | n/a |
CC0026 # 03 Y:2023 | 03 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $116,489 | $300,000 | n/a |
CC0026 # 06 Y:2023 | 06 | 2023 | REPAIR AND ELIMINATE STEAM LEAKS | $992 | $1,500 | n/a |
CC0026 # 05 Y:2023 | 05 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,374 | $77,000 | n/a |
CC0023 # 02 Y:2023 | 02 | 2023 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,633 | $40,000 | n/a |
CC0023 # 01 Y:2023 | 01 | 2023 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $55,102 | $47,144 | n/a |
CC0023 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $147,864 | $750,960 | n/a |