IAC logo
IAC Assessment: CC0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: CC0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Carolina, Charlotte
Assessment Year 2023
Principal Product Portable Power Generation
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $100,000,000-$500,000,000
# of Employees 499
Plant Area (Sq.Ft.) 441,650
Annual Production 33,000 Units
Production Hrs. Annual 8,760
Location (State) NC
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $700,279 13,263,227 kWh $0.05
Electricity Demand $146,958 32,157 kW-months/year $4.57
Electricity Fees $1,734 - $ -
Natural Gas $364,772 33,700 MMBtu $10.82
Fuel Oil #2 $129,240 5,040 MMBtu $25.64
TOTAL ENERGY COSTS $1,342,983
RECOMMENDED SAVINGS* $82,647 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,444
Cost:
$8,455
$2,444 46,113 - - - - - - $2,444
46,113
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$176
Cost:
$351
$158 2,978 $19 4 - - - - $158
2,978
kWh
$19
4
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,571
Cost:
$25,000
$7,666 144,637 $905 198 - - - - $7,666
144,637
kWh
$905
198
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$9,831
Cost:
$10,000
$(-1,401) (-26,438) $(-205) (-45) $11,437 1,057 - - $(-1,401)
(-26,438)
kWh
$(-205)
(-45)
kW-months/year
$11,437
1,057
MMBtu
-
-
$
05: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$26,412
Cost:
$80,000
- - - - $26,412 2,441 - - -
-
kWh
-
-
kW-months/year
$26,412
2,441
MMBtu
-
-
$
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$7,831
Cost:
$93,870
$7,831 147,764 - - - - - - $7,831
147,764
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
07: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT Savings:
$91
Cost:
$600
$91 1,713 - - - - - - $91
1,713
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$27,290
Cost:
$782,250
$6,490 162,452 - - - - $20,800 - $6,490
162,452
kWh
-
-
kW-months/year
-
-
MMBtu
$20,800
-
$
TOTAL RECOMMENDED Savings:
$82,647
Cost:
$1,000,526
$23,279 479,219 $720 157 $37,849 3,498 $20,800 - $23,279
479,219
kWh
$720
157
kW-months/year
$37,849
3,498
MMBtu
$20,800
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost