Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of North Carolina, Charlotte |
---|---|
Assessment Year | 2023 |
Principal Product | Portable Power Generation |
NAICS | 333120 - Construction Machinery Manufacturing |
SIC | 3531 - Construction Machinery |
Sales | $100,000,000-$500,000,000 |
# of Employees | 499 |
Plant Area (Sq.Ft.) | 441,650 |
Annual Production | 33,000 Units |
Production Hrs. Annual | 8,760 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $700,279 | 13,263,227 | kWh | $0.05 |
Electricity Demand | $146,958 | 32,157 | kW-months/year | $4.57 |
Electricity Fees | $1,734 | - | $ | - |
Natural Gas | $364,772 | 33,700 | MMBtu | $10.82 |
Fuel Oil #2 | $129,240 | 5,040 | MMBtu | $25.64 |
TOTAL ENERGY COSTS | $1,342,983 | |||
RECOMMENDED SAVINGS* | $82,647 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | Natural Gas | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,444 Cost: $8,455 |
$2,444 | 46,113 | - | - | - | - | - | - |
$2,444 46,113 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $176 Cost: $351 |
$158 | 2,978 | $19 | 4 | - | - | - | - |
$158 2,978 kWh |
$19 4 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $8,571 Cost: $25,000 |
$7,666 | 144,637 | $905 | 198 | - | - | - | - |
$7,666 144,637 kWh |
$905 198 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $9,831 Cost: $10,000 |
$(-1,401) | (-26,438) | $(-205) | (-45) | $11,437 | 1,057 | - | - |
$(-1,401) (-26,438) kWh |
$(-205) (-45) kW-months/year |
$11,437 1,057 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $26,412 Cost: $80,000 |
- | - | - | - | $26,412 | 2,441 | - | - |
- - kWh |
- - kW-months/year |
$26,412 2,441 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY |
Savings: $7,831 Cost: $93,870 |
$7,831 | 147,764 | - | - | - | - | - | - |
$7,831 147,764 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4324 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT |
Savings: $91 Cost: $600 |
$91 | 1,713 | - | - | - | - | - | - |
$91 1,713 kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS |
Savings: $27,290 Cost: $782,250 |
$6,490 | 162,452 | - | - | - | - | $20,800 | - |
$6,490 162,452 kWh |
- - kW-months/year |
- - MMBtu |
$20,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $82,647 Cost: $1,000,526 |
$23,279 | 479,219 | $720 | 157 | $37,849 | 3,498 | $20,800 | - | $23,279 479,219 kWh |
$720 157 kW-months/year |
$37,849 3,498 MMBtu |
$20,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||