IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0094 # 08 Y:2016 08 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $654 $0 Not Implemented
WM0092 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,839 $5,000 Implemented
WM0092 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $1,420 Implemented
WM0092 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,511 $3,000 Not Implemented
WM0092 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,104 $375 Implemented
WM0092 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $824 $2,005 Not Implemented
WM0091 # 01 Y:2016 01 2016 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $12,568 $2,860 Not Implemented
WM0091 # 02 Y:2016 02 2016 COMBINE UTILITY METERS $8,777 $30,000 Not Implemented
WM0091 # 03 Y:2016 03 2016 INSTALL OCCUPANCY SENSORS $2,746 $1,275 Not Implemented
WM0091 # 04 Y:2016 04 2016 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,722 $0 Not Implemented
WM0091 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,051 $230 Implemented
WM0091 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,795 $1,501 Not Implemented
WM0091 # 07 Y:2016 07 2016 USE PHOTOCELL CONTROLS $1,383 $560 Not Implemented
WM0090 # 01 Y:2016 01 2016 INCREASE USE OF AUTOMATION $76,500 $6,500 Not Implemented
WM0090 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,362 $1,245 Implemented
WM0090 # 03 Y:2016 03 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,717 $1,245 Not Implemented
WM0090 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $1,988 $1,575 Not Implemented
WM0090 # 05 Y:2016 05 2016 USE PHOTOCELL CONTROLS $1,577 $1,120 Not Implemented
WM0089 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $15,954 $6,213 Not Implemented
WM0089 # 02 Y:2016 02 2016 USE PHOTOCELL CONTROLS $628 $290 Not Implemented
WM0089 # 03 Y:2016 03 2016 INCREASE USE OF AUTOMATION $52,696 $6,000 Not Implemented
WM0089 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,394 $0 Not Implemented
WM0089 # 05 Y:2016 05 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $11,093 $0 Not Implemented
WM0089 # 06 Y:2016 06 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $392 $690 Not Implemented
WM0087 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,712 $23,070 Not Implemented