IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0030 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $2,980 $167 Not Implemented
RU0030 # 04 Y:1988 04 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $20,724 $17,000 Not Implemented
TN0348 # 01 Y:1988 01 1988 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $36,025 $30,400 Not Implemented
TN0348 # 02 Y:1988 02 1988 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $29,414 $3,200 Implemented
TN0348 # 03 Y:1988 03 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $15,528 $0 Not Implemented
TN0348 # 04 Y:1988 04 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,484 $0 Implemented
TN0348 # 05 Y:1988 05 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,890 $720 Implemented
TN0350 # 01 Y:1988 01 1988 KEEP LAMPS AND REFLECTORS CLEAN $3,434 $3,103 Implemented
TN0350 # 02 Y:1988 02 1988 INSULATE BARE EQUIPMENT $1,360 $375 Not Implemented
TN0350 # 03 Y:1988 03 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $310 $0 Implemented
TN0350 # 04 Y:1988 04 1988 INSTALL SET-BACK TIMERS $221 $0 Implemented
TN0350 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $170 $108 Implemented
TN0350 # 06 Y:1988 06 1988 IMPROVE LUBRICATION PRACTICES $136 $60 Implemented
TN0352 # 01 Y:1988 01 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,932 $14,800 Not Implemented
TN0352 # 02 Y:1988 02 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,719 $300 Implemented
TN0352 # 03 Y:1988 03 1988 REPAIR AND ELIMINATE STEAM LEAKS $2,076 $440 Implemented
TN0352 # 04 Y:1988 04 1988 INSTALL TIMERS AND/OR THERMOSTATS $755 $1,040 Not Implemented
TN0352 # 05 Y:1988 05 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $750 $1,019 Implemented
TN0352 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,533 $875 Implemented
TN0352 # 07 Y:1988 07 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $722 $0 Implemented
TN0352 # 08 Y:1988 08 1988 IMPROVE LUBRICATION PRACTICES $412 $232 Not Implemented
TN0352 # 09 Y:1988 09 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $432 $195 Implemented
UD0268 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,113 $0 Implemented
UD0268 # 02 Y:1988 02 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,128 $3,448 Implemented
UD0268 # 03 Y:1988 03 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,096 $3,000 Implemented