IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0445 # 08 Y:1994 08 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $340 $220 Implemented
KU0445 # 09 Y:1994 09 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,489 $3,000 Not Implemented
KU0445 # 10 Y:1994 10 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,387 $90 Not Implemented
MA0318 # 01 Y:1994 01 1994 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,673 $4,305 Not Implemented
MA0318 # 02 Y:1994 02 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $7,659 $3,520 Not Implemented
MA0318 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $3,319 $521 Implemented
MA0318 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $2,338 $4,349 Not Implemented
MA0318 # 05 Y:1994 05 1994 USE RADIANT HEATER FOR SPOT HEATING $1,100 $1,410 Not Implemented
MA0318 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $6,000 $500 Not Implemented
MA0318 # 07 Y:1994 07 1994 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,520 $383 Not Implemented
AR0040 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,273 $250 Implemented
AR0040 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,679 $887 Implemented
AR0040 # 03 Y:1994 03 1994 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,921 $870 Implemented
AR0040 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,622 $4,610 Implemented
AR0040 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $770 $456 Implemented
AR0040 # 06 Y:1994 06 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $56,477 $1,000 Implemented
AR0040 # 07 Y:1994 07 1994 REPAIR AND ELIMINATE STEAM LEAKS $16,520 $1,000 Implemented
BD0013 # 01 Y:1994 01 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,745 $2,250 Not Implemented
BD0013 # 02 Y:1994 02 1994 RECOVER WASTE HEAT FROM EQUIPMENT $7,926 $100 Not Implemented
BD0013 # 03 Y:1994 03 1994 RECOVER AND REUSE COOLING WATER $1,975 $5,000 Not Implemented
BD0013 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,553 $13,640 Not Implemented
BD0013 # 05 Y:1994 05 1994 INSTALL TURBULATORS $1,003 $2,400 Not Implemented
BD0013 # 06 Y:1994 06 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,835 $13,008 Not Implemented
ND0198 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,906 $1,523 Implemented
ND0198 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,740 $750 Not Implemented