IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0619 # 01 Y:2001 01 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $792 $310 Implemented
OK0619 # 02 Y:2001 02 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,585 $18,400 Not Implemented
OK0619 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $816 $878 Not Implemented
OK0619 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,184 $200 Implemented
OK0619 # 05 Y:2001 05 2001 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,191 $1,423 Not Implemented
OK0619 # 06 Y:2001 06 2001 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $38,340 $12,500 Not Implemented
OK0619 # 07 Y:2001 07 2001 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $68,500 $15,000 Implemented
OK0619 # 08 Y:2001 08 2001 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,200 $1,326 Implemented
OK0619 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,082 $3,936 Not Implemented
OK0619 # 10 Y:2001 10 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $12,577 $3,000 Implemented
OK0619 # 11 Y:2001 11 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,523 $10,275 Implemented
OK0619 # 12 Y:2001 12 2001 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $29,565 $10,000 Not Implemented
OK0619 # 13 Y:2001 13 2001 PAY BILLS ON TIME TO AVOID LATE FEES $877 $0 Implemented
MI0024 # 01 Y:2001 01 2001 ISOLATE HOT OR COLD EQUIPMENT $156,000 $10,000 n/a
MI0024 # 02 Y:2001 02 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,590 $7 n/a
MI0024 # 03 Y:2001 03 2001 ADD AREA LIGHTING SWITCHES $2,108 $1,000 n/a
MI0024 # 04 Y:2001 04 2001 ADD AREA LIGHTING SWITCHES $1,333 $700 n/a
MI0024 # 05 Y:2001 05 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $200 $2 n/a
SU0104 # 01 Y:2001 01 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $92 $0 Implemented
SU0104 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $147 $0 Implemented
SU0104 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,030 $4,460 Implemented
SU0104 # 04 Y:2001 04 2001 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,614 $20,500 Not Implemented
SU0104 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $30 $79 Not Implemented
TA0014 # 01 Y:2001 01 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,969 $1,900 Implemented
TA0014 # 02 Y:2001 02 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $8,100 $11,960 Implemented