IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,377

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0262 # 03 Y:1985 03 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $165 $168 Implemented
GT0262 # 04 Y:1985 04 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $468 $75 Implemented
KU0163 # 01 Y:1985 01 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $12,428 $10,700 Not Implemented
KU0163 # 02 Y:1985 02 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,439 $500 Implemented
KU0163 # 03 Y:1985 03 1985 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $461 $400 Implemented
KU0163 # 04 Y:1985 04 1985 INSULATE BARE EQUIPMENT $499 $60 Implemented
KU0163 # 05 Y:1985 05 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,087 $50 Not Implemented
KU0163 # 06 Y:1985 06 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $979 $0 Implemented
KU0163 # 07 Y:1985 07 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $2,124 $4,200 Not Implemented
KU0163 # 08 Y:1985 08 1985 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $400 $750 Not Implemented
KU0163 # 09 Y:1985 09 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $462 $140 Implemented
KU0163 # 10 Y:1985 10 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,233 $50 Not Implemented
KU0163 # 11 Y:1985 11 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $130 $180 Implemented
KU0163 # 12 Y:1985 12 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $357 $455 Implemented
KU0163 # 13 Y:1985 13 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $324 $175 Implemented
KU0163 # 14 Y:1985 14 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,054 $500 Not Implemented
KU0163 # 15 Y:1985 15 1985 IMPROVE LUBRICATION PRACTICES $1,119 $1,016 Not Implemented
KU0163 # 16 Y:1985 16 1985 INSTALL TIMERS AND/OR THERMOSTATS $2,273 $1,000 Implemented
KU0163 # 17 Y:1985 17 1985 INSTALL AUTOMATIC STACK DAMPER $363 $900 Implemented
KU0163 # 18 Y:1985 18 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $160 $0 Implemented
KU0163 # 19 Y:1985 19 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11 $0 Not Implemented
KU0163 # 20 Y:1985 20 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,287 $2,874 Not Implemented
KU0164 # 01 Y:1985 01 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,820 $500 Implemented
KU0164 # 02 Y:1985 02 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,280 $4,700 Not Implemented
KU0164 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $1,475 $500 Implemented