Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,377
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0262 # 03 Y:1985 | 03 | 1985 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $165 | $168 | Implemented |
GT0262 # 04 Y:1985 | 04 | 1985 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $468 | $75 | Implemented |
KU0163 # 01 Y:1985 | 01 | 1985 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $12,428 | $10,700 | Not Implemented |
KU0163 # 02 Y:1985 | 02 | 1985 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,439 | $500 | Implemented |
KU0163 # 03 Y:1985 | 03 | 1985 | RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT | $461 | $400 | Implemented |
KU0163 # 04 Y:1985 | 04 | 1985 | INSULATE BARE EQUIPMENT | $499 | $60 | Implemented |
KU0163 # 05 Y:1985 | 05 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,087 | $50 | Not Implemented |
KU0163 # 06 Y:1985 | 06 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $979 | $0 | Implemented |
KU0163 # 07 Y:1985 | 07 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $2,124 | $4,200 | Not Implemented |
KU0163 # 08 Y:1985 | 08 | 1985 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $400 | $750 | Not Implemented |
KU0163 # 09 Y:1985 | 09 | 1985 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $462 | $140 | Implemented |
KU0163 # 10 Y:1985 | 10 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,233 | $50 | Not Implemented |
KU0163 # 11 Y:1985 | 11 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130 | $180 | Implemented |
KU0163 # 12 Y:1985 | 12 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $357 | $455 | Implemented |
KU0163 # 13 Y:1985 | 13 | 1985 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $324 | $175 | Implemented |
KU0163 # 14 Y:1985 | 14 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,054 | $500 | Not Implemented |
KU0163 # 15 Y:1985 | 15 | 1985 | IMPROVE LUBRICATION PRACTICES | $1,119 | $1,016 | Not Implemented |
KU0163 # 16 Y:1985 | 16 | 1985 | INSTALL TIMERS AND/OR THERMOSTATS | $2,273 | $1,000 | Implemented |
KU0163 # 17 Y:1985 | 17 | 1985 | INSTALL AUTOMATIC STACK DAMPER | $363 | $900 | Implemented |
KU0163 # 18 Y:1985 | 18 | 1985 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $160 | $0 | Implemented |
KU0163 # 19 Y:1985 | 19 | 1985 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11 | $0 | Not Implemented |
KU0163 # 20 Y:1985 | 20 | 1985 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,287 | $2,874 | Not Implemented |
KU0164 # 01 Y:1985 | 01 | 1985 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,820 | $500 | Implemented |
KU0164 # 02 Y:1985 | 02 | 1985 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,280 | $4,700 | Not Implemented |
KU0164 # 03 Y:1985 | 03 | 1985 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,475 | $500 | Implemented |