IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0556 # 11 Y:2024 11 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $7,286 $4,767 n/a
SU0556 # 12 Y:2024 12 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,916 $12,528 n/a
SU0556 # 13 Y:2024 13 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $766 $771 n/a
SU0556 # 14 Y:2024 14 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $402 $537 n/a
SU0556 # 15 Y:2024 15 2024 INSTALL OCCUPANCY SENSORS $557 $1,283 n/a
SU0556 # 16 Y:2024 16 2024 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $9,480 $25,942 n/a
SU0556 # 17 Y:2024 17 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $240,268 $897,305 n/a
IC0308 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $832 $1,522 n/a
IC0308 # 02 Y:2024 02 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $62 $288 n/a
IC0308 # 03 Y:2024 03 2024 INSTALL SPECTRAL REFLECTORS / DELAMP $369 $422 n/a
IC0308 # 04 Y:2024 04 2024 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $146 $490 n/a
IC0308 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,604 $2,986 n/a
IC0308 # 06 Y:2024 06 2024 AIR CONDITION ONLY SPACE NECESSARY $1,564 $5,300 n/a
IC0308 # 07 Y:2024 07 2024 INSTALL OCCUPANCY SENSORS $1,657 $0 n/a
IC0308 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $30,752 $190,030 n/a
IC0308 # 09 Y:2024 09 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,885 $12,020 n/a
IC0308 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $754 $0 n/a
UU0257 # 01 Y:2024 01 2024 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $9,024 $16,577 n/a
UU0257 # 02 Y:2024 02 2024 INCREASE USE OF AUTOMATION $2,630 $12,300 n/a
UU0257 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $26,762 $79,343 n/a
UU0257 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,182 $19,121 n/a
UU0257 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,252 $5,785 n/a
NL0096 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $58,179 $20,000 n/a
NL0096 # 02 Y:2024 02 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $45,060 $54,620 n/a
NL0096 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $40,407 $21,500 n/a