IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0442 # 02 Y:2017 02 2017 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,092 $0 Implemented
SU0442 # 03 Y:2017 03 2017 ELIMINATE/REDUCE AN OPERATION $10,476 $4,400 Implemented
SU0442 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,098 $946 Not Implemented
SU0442 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $948 $563 Implemented
SU0442 # 06 Y:2017 06 2017 REDUCE VENTILATION AIR $1,697 $1,147 Not Implemented
SU0442 # 07 Y:2017 07 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,087 $7,500 Not Implemented
SU0442 # 08 Y:2017 08 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $74 $208 Implemented
SU0442 # 09 Y:2017 09 2017 UPGRADE OBSOLETE EQUIPMENT $108 $356 Implemented
SU0441 # 01 Y:2017 01 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,195 $0 Not Implemented
SU0441 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $10,649 $1,130 Not Implemented
SU0441 # 03 Y:2017 03 2017 RECOVER WASTE HEAT FROM EQUIPMENT $3,779 $459 Not Implemented
SU0441 # 04 Y:2017 04 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,408 $879 Not Implemented
SU0441 # 05 Y:2017 05 2017 ELIMINATE/REDUCE AN OPERATION $630 $762 Not Implemented
SU0441 # 06 Y:2017 06 2017 REDUCE VENTILATION AIR $448 $1,147 Not Implemented
SU0441 # 07 Y:2017 07 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $299 $916 Not Implemented
SU0440 # 01 Y:2017 01 2017 INSTALL OCCUPANCY SENSORS $340 $146 Implemented
SU0440 # 02 Y:2017 02 2017 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,272 $1,167 Implemented
SU0440 # 03 Y:2017 03 2017 ELIMINATE/REDUCE AN OPERATION $9,234 $6,378 Not Implemented
SU0440 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $150 $175 Implemented
SU0440 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $720 $1,739 Implemented
SU0440 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $543 $1,430 Not Implemented
SU0440 # 07 Y:2017 07 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,138 $3,990 Not Implemented
SU0440 # 08 Y:2017 08 2017 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $422 $1,723 Not Implemented
SU0439 # 01 Y:2017 01 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,112 $0 Implemented
SU0439 # 02 Y:2017 02 2017 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $947 $0 Implemented