IAC logo
IAC Assessment: SU0466
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0466
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2018
Principal Product Welded Carbon Steel Tubing
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 62,550
Annual Production 36,000,000 Pounds
Production Hrs. Annual 6,240
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $515,570 11,535,095 kWh $0.04
Electricity Demand $327,901 28,928 kW-months/year $11.34
Electricity Fees $38,273 - $ -
Natural Gas $72,597 14,310 MMBtu $5.07
TOTAL ENERGY COSTS $954,341
RECOMMENDED SAVINGS* $197,726 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,351
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$9,225
Cost:
$1,173
- - - - $4,164 - - - $5,061 - -
-
kWh
-
-
kW-months/year
$4,164
-
$
-
-
$
$5,061
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$5,326
Cost:
$2,058
$5,326 119,152 - - - - - - - - $5,326
119,152
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$166,039
Cost:
$203,490
- - - - - - $18,000 - $148,039 - -
-
kWh
-
-
kW-months/year
-
-
$
$18,000
-
$
$148,039
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$586
Cost:
$876
$183 4,100 $64 6 $339 - - - - - $183
4,100
kWh
$64
6
kW-months/year
$339
-
$
-
-
$
-
-
$
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$111
Cost:
$217
$111 2,477 - - - - - - - - $111
2,477
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,439
Cost:
$44,602
$8,334 186,450 $4,142 365 $3,963 - - - - - $8,334
186,450
kWh
$4,142
365
kW-months/year
$3,963
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$197,726
Cost:
$252,416
$13,954 312,179 $4,206 371 $8,466 - $18,000 - $153,100 - $13,954
312,179
kWh
$4,206
371
kW-months/year
$8,466
-
$
$18,000
-
$
$153,100
-
$
TOTAL IMPLEMENTED Savings:
$22,351
Cost:
$47,536
$13,843 309,702 $4,206 371 $4,302 - - - - - $13,843
309,702
kWh
$4,206
371
kW-months/year
$4,302
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost