IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,063

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0082 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $5,195 $825 Not Implemented
WM0082 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,792 $280 Implemented
WM0082 # 06 Y:2016 06 2016 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,896 $2,068 Not Implemented
WM0082 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,050 $1,650 Not Implemented
WM0082 # 08 Y:2016 08 2016 USE SYNTHETIC LUBRICANT $2,423 $9,400 Not Implemented
WM0081 # 01 Y:2016 01 2016 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $108,824 $71,331 Not Implemented
WM0081 # 02 Y:2016 02 2016 USE RADIANT HEATER FOR SPOT HEATING $41,066 $7,400 Not Implemented
WM0081 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $48,136 $20,000 Not Implemented
WM0081 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,666 $4,583 Not Implemented
WM0081 # 05 Y:2016 05 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $8,381 $1,000 Implemented
WM0081 # 06 Y:2016 06 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,837 $2,625 Not Implemented
WM0081 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $4,636 $7,160 Not Implemented
WM0081 # 08 Y:2016 08 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,981 $2,000 Implemented
WM0081 # 09 Y:2016 09 2016 INSTALL OCCUPANCY SENSORS $450 $180 Not Implemented
WM0080 # 01 Y:2016 01 2016 USE SYNTHETIC LUBRICANT $4,146 $4,500 Not Implemented
WM0080 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,385 $1,225 Implemented
WM0080 # 03 Y:2016 03 2016 USE SYNTHETIC LUBRICANT $3,352 $1,507 Not Implemented
WM0080 # 04 Y:2016 04 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,109 $780 Not Implemented
WM0080 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,338 $0 Implemented
WM0080 # 06 Y:2016 06 2016 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,275 $1,589 Not Implemented
WM0080 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,246 $1,600 Not Implemented
WM0080 # 08 Y:2016 08 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $312 $122 Not Implemented
WM0079 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,526 $12,300 Not Implemented
WM0079 # 02 Y:2015 02 2015 USE SYNTHETIC LUBRICANT $8,412 $2,365 Not Implemented
WM0079 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,351 $1,600 Not Implemented