IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

110,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0098 # 12 Y:1983 12 1983 INSTALL SET-BACK TIMERS $2,264 $0 Not Implemented
KU0099 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,778 $2,585 Implemented
KU0099 # 02 Y:1983 02 1983 INSTALL AUTOMATIC STACK DAMPER $935 $2,350 Implemented
KU0099 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $628 $660 Implemented
KU0099 # 04 Y:1983 04 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $544 $0 Implemented
KU0100 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,005 $4,164 Not Implemented
KU0100 # 02 Y:1983 02 1983 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $3,578 $10,000 Not Implemented
KU0100 # 03 Y:1983 03 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,770 $2,400 Not Implemented
KU0100 # 04 Y:1983 04 1983 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,967 $10,000 Not Implemented
KU0100 # 05 Y:1983 05 1983 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $41,200 $41,500 Not Implemented
TN0172 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,165 $3,500 Not Implemented
TN0172 # 02 Y:1983 02 1983 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,755 $0 Not Implemented
TN0172 # 03 Y:1983 03 1983 INSULATE BARE EQUIPMENT $1,360 $13,000 Not Implemented
TN0172 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,063 $700 Not Implemented
TN0183 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $12,515 $527 Implemented
TN0183 # 02 Y:1983 02 1983 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,500 $5,000 Implemented
TN0183 # 03 Y:1983 03 1983 INSTALL / REPAIR INSULATION ON STEAM LINES $3,810 $2,000 Implemented
TN0183 # 04 Y:1983 04 1983 INSULATE BARE EQUIPMENT $1,268 $1,790 Not Implemented
UD0090 # 01 Y:1983 01 1983 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,380 $8,000 Not Implemented
UD0090 # 02 Y:1983 02 1983 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $1,074 $1,300 Not Implemented
UD0090 # 03 Y:1983 03 1983 INSTALL STORM WINDOWS AND DOORS $703 $100 Implemented
UD0090 # 04 Y:1983 04 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,164 $785 Not Implemented
UD0090 # 05 Y:1983 05 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $183 $0 Implemented
UD0091 # 01 Y:1983 01 1983 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $13,041 $4,710 Not Implemented
UD0091 # 02 Y:1983 02 1983 INSTALL TIMERS AND/OR THERMOSTATS $11,682 $4,000 Not Implemented