IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,553

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0291 # 02 Y:1994 02 1994 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,457 $1,072 Not Implemented
MA0291 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,086 $0 Implemented
MA0291 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $586 $0 Implemented
MA0286 # 01 Y:1993 01 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $32,481 $19,668 Not Implemented
MA0286 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,546 $0 Not Implemented
MA0286 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,588 $5,514 Not Implemented
MA0286 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $11,128 $4,920 Not Implemented
MA0286 # 05 Y:1993 05 1993 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,158 $7,565 Not Implemented
MA0286 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $1,034 $0 Not Implemented
MA0285 # 01 Y:1993 01 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $109,286 $73,056 Not Implemented
MA0285 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $55,888 $14,720 Not Implemented
MA0285 # 03 Y:1993 03 1993 REPLACE BOILER $26,214 $0 Implemented
MA0285 # 04 Y:1993 04 1993 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $20,398 $47,520 Not Implemented
MA0285 # 05 Y:1993 05 1993 RECOVER WASTE HEAT FROM EQUIPMENT $9,189 $7,537 Not Implemented
MA0285 # 06 Y:1993 06 1993 RECOVER AND REUSE COOLING WATER $4,616 $385 Not Implemented
MA0285 # 07 Y:1993 07 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,120 $7,480 Not Implemented
MA0285 # 08 Y:1993 08 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $900 $320 Not Implemented
MA0284 # 01 Y:1993 01 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $689 $685 Implemented
MA0284 # 02 Y:1993 02 1993 ADD AREA LIGHTING SWITCHES $761 $600 Not Implemented
MA0284 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $725 $1,095 Not Implemented
MA0284 # 04 Y:1993 04 1993 INSULATE BARE EQUIPMENT $290 $234 Not Implemented
MA0284 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $158 $0 Implemented
MA0284 # 06 Y:1993 06 1993 INSTALL OCCUPANCY SENSORS $181 $218 Not Implemented
MA0282 # 01 Y:1993 01 1993 USE OPTIMUM TEMPERATURE $22,157 $11,271 Not Implemented
MA0282 # 02 Y:1993 02 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,828 $23,220 Implemented