IAC logo
IAC Assessment: MA0298
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0298
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1994
Principal Product bearing balls and frictionless bearings
NAICS n/a
SIC 3562 - Ball And Roller Bearings
Sales $10,000,000-$50,000,000
# of Employees 169
Plant Area (Sq.Ft.) 124,000
Annual Production 0 Units
Production Hrs. Annual 6,656
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $388,977 4,545,721 kWh $0.09
Natural Gas $77,698 9,994 MMBtu $7.77
LPG $2,976 143 MMBtu $20.81
TOTAL ENERGY COSTS $469,651
RECOMMENDED SAVINGS* $77,134 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,282
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,165
Cost:
-
$14,165 167,644 - - - - $14,165
167,644
kWh
-
-
MMBtu
-
-
$
02: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$31,402
Cost:
$46,488
- - - - $31,402 - -
-
kWh
-
-
MMBtu
$31,402
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$9,355
Cost:
$2,620
$9,355 109,320 - - - - $9,355
109,320
kWh
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,944
Cost:
-
$5,944 69,461 - - - - $5,944
69,461
kWh
-
-
MMBtu
-
-
$
05: 2.2222 CONVERT LIQUID HEATERS FROM UNDERFIRING TO IMMERSION OR SUBMERSION HEATING Savings:
$3,590
Cost:
$2,454
- - $3,590 462 - - -
-
kWh
$3,590
462
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,765
Cost:
$3,077
$2,765 32,239 - - - - $2,765
32,239
kWh
-
-
MMBtu
-
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,580
Cost:
$474
$1,580 18,464 - - - - $1,580
18,464
kWh
-
-
MMBtu
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$373
Cost:
$1,024
- - $373 48 - - -
-
kWh
$373
48
MMBtu
-
-
$
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,095
Cost:
$12,313
$6,095 71,219 - - - - $6,095
71,219
kWh
-
-
MMBtu
-
-
$
10: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$779
Cost:
$783
$1,129 13,189 $(-350) (-45) - - $1,129
13,189
kWh
$(-350)
(-45)
MMBtu
-
-
$
11: 2.7122 DISCONNECT BALLASTS Savings:
$677
Cost:
-
$677 7,913 - - - - $677
7,913
kWh
-
-
MMBtu
-
-
$
12: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$409
Cost:
$988
$409 4,689 - - - - $409
4,689
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$77,134
Cost:
$70,221
$42,119 494,138 $3,613 465 $31,402 - $42,119
494,138
kWh
$3,613
465
MMBtu
$31,402
-
$
TOTAL IMPLEMENTED Savings:
$30,282
Cost:
$8,800
$26,669 313,599 $3,613 465 - - $26,669
313,599
kWh
$3,613
465
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes