IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,263

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0701 # 09 Y:2016 09 2016 INSULATE BARE EQUIPMENT $1,325 $1,200 Implemented
AM0622 # 01 Y:2012 01 2012 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $80,000 $240,000 Not Implemented
AM0622 # 02 Y:2012 02 2012 MINIMIZE WATER USAGE $42,000 $7,000 Not Implemented
AM0622 # 03 Y:2012 03 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $25,450 $69,300 Implemented
AM0622 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,720 $520 Implemented
AM0622 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,770 $55 Not Implemented
AM0622 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,900 $500 Not Implemented
AM0622 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,780 $870 Implemented
AM0622 # 08 Y:2012 08 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,300 $0 Not Implemented
AM0622 # 09 Y:2012 09 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $560 $0 Implemented
AM0622 # 10 Y:2012 10 2012 USE SYNTHETIC LUBRICANT $550 $0 Not Implemented
LL0368 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $157,413 $35,600 Not Implemented
LL0368 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $110,468 $2,180 Not Implemented
LL0368 # 03 Y:2012 03 2012 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $17,664 $6,849 Not Implemented
LL0368 # 04 Y:2012 04 2012 AIR CONDITION ONLY SPACE NECESSARY $15,433 $30 Not Implemented
LL0368 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,648 $5,820 Not Implemented
LL0368 # 06 Y:2012 06 2012 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,986 $1,500 Not Implemented
LL0368 # 07 Y:2012 07 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,061 $1,089 Not Implemented
LL0368 # 08 Y:2012 08 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $940 $1,654 Not Implemented
LL0368 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $932 $4,620 Not Implemented
LL0368 # 10 Y:2012 10 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $769 $418 Not Implemented
AM0613 # 01 Y:2012 01 2012 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $21,010 $38,103 Implemented
AM0613 # 02 Y:2012 02 2012 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $16,300 $20,900 Implemented
AM0613 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $14,800 $2,230 Not Implemented
AM0613 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,265 $600 Implemented