IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,629

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0039 # 05 Y:1988 05 1988 SHUT OFF PILOTS IN STANDBY EQUIPMENT $274 $0 Implemented
WI0037 # 07 Y:1988 07 1988 RECOVER WASTE HEAT FROM EQUIPMENT $2,695 $1,500 Implemented
WI0037 # 06 Y:1988 06 1988 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,189 $0 Implemented
WI0037 # 05 Y:1988 05 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,732 $0 Implemented
WI0037 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $885 $1,000 Implemented
WI0037 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,747 $33,748 Implemented
WI0037 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,535 $0 Implemented
WI0037 # 01 Y:1988 01 1988 IMPROVE LUBRICATION PRACTICES $3,862 $0 Not Implemented
MA0122 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,227 $261 Not Implemented
MA0122 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,093 $6,500 Not Implemented
MA0122 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,193 $300 Not Implemented
MA0122 # 04 Y:1988 04 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,916 $10,000 Implemented
MA0122 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,883 $3,400 Implemented
KU0256 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,474 $8,895 Not Implemented
KU0256 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $7,001 $0 Implemented
KU0256 # 03 Y:1988 03 1988 IMPROVE LUBRICATION PRACTICES $452 $0 Implemented
KU0256 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $301 $0 Implemented
KU0256 # 05 Y:1988 05 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $309 $600 Implemented
KU0256 # 06 Y:1988 06 1988 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $265 $0 Not Implemented
KU0257 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,773 $2,670 Not Implemented
KU0257 # 02 Y:1988 02 1988 INSTALL AUTOMATIC STACK DAMPER $2,887 $4,800 Implemented
KU0257 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,063 $750 Implemented
KU0257 # 04 Y:1988 04 1988 IMPROVE LUBRICATION PRACTICES $2,456 $0 Implemented
KU0257 # 05 Y:1988 05 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,026 $0 Implemented
KU0257 # 06 Y:1988 06 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,636 $1,700 Implemented